MIS06-00153
| MIS-Aging Inspection | 5/7/2007 | 5/7/2007 | 5/8/2007 11:54:31 AM | | CANC |
|
|
|
MIS06-00133
| MIS-Aging Inspection | 5/7/2007 | 5/7/2007 | 5/8/2007 11:36:54 AM | | CANC |
|
|
|
BLD06-00909
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 4:54:18 PM | P | PASS |
|
|
kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-00916
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 4:53:58 PM | P | PASS |
|
|
carte; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-00927
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 4:53:33 PM | P | PASS |
|
|
carte; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-00915
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 4:09:42 PM | P | PASS |
|
|
carte; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-00908
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 4:09:17 PM | P | PASS |
|
|
carte; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-01621
| BLD-Conference | 5/7/2007 | 5/7/2007 | 5/7/2007 3:59:15 PM | P | PART |
|
|
Inspect firestop around perimeter of building. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Inspected fatgrid for hardlid at exterior canopy. Framing for restroom was moved to achieve 18 clearance for ada. Also still waiting on paperworkwork for aspproved smokestop system at slab edge to curtainwall. Still needs to firecaulk at exterior south 2hr wall on south stasirtower. Also noted that conmtractor needs to remove some plumbing and elec. outlets at south stairtower mainlevel by riser room. Contractor also wanted to know the possibilities of eliminating the north shaft and place fire/smoke dampers for each duct and everyfloor opening. This may be fesible but is a major design change which would require drawing from architect and submitted to plan review.
|
BLD06-00906
| BLD-Framing/Rough-in | 5/7/2007 | 5/7/2007 | 5/7/2007 1:57:49 PM | P | PASS |
|
|
carte; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD07-00419
| BLD-Final | 5/7/2007 | 5/7/2007 | 5/7/2007 10:18:54 AM | A | PASS |
|
|
Mike, I left the plans and the inspection card with the receptionist. Her name is Brooke. Call me with any questions. Thanks, Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns. ok for perm occ.
|
BLD06-02105
| BLD-Energy code compliance | 5/7/2007 | 5/7/2007 | 5/7/2007 9:01:55 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 5/7/2007 at 7:22:58 AM. Fireblocking not complete. Needs to install blocking at 1hr walls to maintain nailing pattern per approved assembly.
|