Inspections for the day of: Wednesday, May 7, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00206 BLD-Final5/6/20085/7/20085/8/2008 6:35:34 AMANR
gabe Phone #: ###-####
BLD08-00271 BLD-Final5/7/20085/7/20085/8/2008 6:34:25 AMPNR
john Phone #: ###-#### needs code enforcement final
BLD07-02455 BLD-Framing/Rough-in5/7/20085/7/20085/7/2008 3:19:23 PMPPART
Rob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to one side needs to fire block and finish one hr around stairs
BLD08-00410 BLD-Energy code compliance5/7/20085/7/20085/7/2008 3:18:12 PMPPASS
Jim, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD08-00195 BLD-Foundation5/7/20085/7/20085/7/2008 2:17:07 PMPNR
Scheduled by a contractor via Hello! on 5/7/2008 at 7:14:41 AM.
BLD06-01451 BLD-Conference5/7/20085/7/20085/7/2008 1:52:55 PMPPART
Dave; We are doing more shaft drywall vertical. We will be installing both layers,then fire taping.Drywall forman said you were OK with them installing both layers as long as it was called in. Is that stair towers third level res ok on outer layer of sheetrock
OK? Call me if it is not OK. Thanks,Bob
Phone #: ###-#### Internet Inspection Request from: bob austin
BLD07-03026 BLD-Framing/Rough-in5/6/20085/7/20085/7/2008 9:05:31 AMAPASS
Hard lid inspections for building a of 252 and hard lid for bathrooms building b of 252
Thanks Phone #: ###-#### Internet Inspection Request from: Ron Oswald