ELE08-01053
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 6:20:22 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 11:00:04 AM. Contact: ###-####. . .1. final ok. . .
|
ELE08-00648
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 5:47:13 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 10:58:25 AM. Contact: ###-####. . .1. final ok. . .
|
ELE08-01006
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 5:25:34 PM | P | PASS |
|
|
back door will be unlocked. pool side 1 door past meter pack please lock door behind you. Phone #: ###-#### Internet Inspection Request from: Shane Vigil . .1. final ok. . .
|
MIS08-00075
| ELE-Conference | 5/6/2008 | 5/7/2008 | 5/7/2008 1:24:52 PM | P | FAIL |
|
|
to check code compliance on ADU//Mike ###-#### . .1. upon the initial inspection there were obvious violations--a. wall and countertop spacing, b. free length of conductors in the box. . . . .2. with that in mind it is necessary to have the walls opened up where the wiring is installed. . . . .3. also all devices and luminairs shall be opened for inspection. . .
|
ELE08-01144
| Electrical Rough-In | 5/6/2008 | 5/7/2008 | 5/7/2008 12:14:29 PM | A | PASS |
|
|
kary Phone #: ###-#### Note:please call 1/2 hr prior to inspection . .1. ri ok--survey note-210.52 kitchen recep locations wall and counters. . .
|
ELE08-00816
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 10:27:00 AM | A | PASS |
|
|
Can meet anytime after 9:00 am please give me half an hour to get there. This is a occupied residence. Thanks Shaun ###-#### Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman . .1. final ok. . .
|
ELE08-00648
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 9:36:18 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 6:32:31 AM. Contact: ###-####. . .1. waiting on panel schedules. . .
|
ELE08-01053
| Final | 5/7/2008 | 5/7/2008 | 5/7/2008 9:08:47 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 6:33:57 AM. Contact: ###-####. . .1. wrong type insp., should be ri, see ri for this date in the am. . .
|
ELE08-01053
| Electrical Rough-In | 5/7/2008 | 5/7/2008 | 5/7/2008 9:07:45 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 6:33:57 AM. Contact: ###-####. . .1. ri ok. . . . .2. walls only. . .
|
ELE08-01146
| Final | 5/6/2008 | 5/7/2008 | 5/7/2008 8:46:55 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Sean Peltier . .1. final ok. . .
|
ELE08-01146
| Rough-In Permanent Service | 5/7/2008 | 5/7/2008 | 5/7/2008 8:43:35 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Sean Peltier . .1. ri ok. . . . .2. p/s o/h reconnect ok see note 3. . . . .3. IDAHO POWER--PLEASE NOTE--all that is needed for this is a meter.
|