Inspections for the day of: Wednesday, May 7, 2008.
Number of inspections: 45
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC04-01414 Aging Inspection5/7/20085/7/20085/12/2008 1:12:45 PM PASS
moved to a site final.
CAS
#460
ESC05-00619 Aging Inspection5/7/20085/7/20085/9/2008 3:31:39 PM PASS
Work complete.
CAS
#460
ESC05-01050 Aging Inspection5/7/20085/7/20085/8/2008 3:04:10 PM PART
work is not complete but is being kept up left a message for the RP.
CAS
#460
ESC03-01520 Aging Inspection5/7/20085/7/20085/8/2008 11:07:42 AM PASS
Moved to a site final.
CAS
#460
ESC05-01439 Aging Inspection5/7/20085/7/20085/8/2008 10:00:32 AM PASS
Moved to a site final.
CAS
#460
ESC05-01441 Aging Inspection5/7/20085/7/20085/8/2008 9:59:17 AM PASS
Moved to a site final
CAS
#460
ESC05-01024 Aging Inspection5/7/20085/7/20085/8/2008 8:58:18 AM FAIL
Need to stabilize vacant lot. Refer to ESC05-01025
CAS
#460
ESC05-01178 Aging Inspection5/7/20085/7/20085/8/2008 8:37:48 AM PASS
Work is complete. Site final.
CAS
#460
ESC08-00244 BMP Violation5/7/20085/7/20085/7/2008 3:49:03 PMPFAIL
Spoke with RP over the issues of picking up all the trash scattered around the project. Clean the D.I.'s on the project area. put back the bmp's infront of the lot. Will re-inspect on on Friday the 9th.
CAS
#460
ESC07-00140 Site Preparation5/7/20085/7/20085/7/2008 2:30:59 PMPPASS
site looks good. Sign posted at entrance of site. Construction entrance is in good condition. Site is kept very clean.
CAS
#460
ESC07-00054 Site Final5/7/20085/7/20085/7/2008 2:08:23 PMPPASS
Demo work complete and Building complete. Refer to ESC07-00232
CAS
#460
ESC07-00232 Site Final5/7/20085/7/20085/7/2008 2:05:46 PMPPASS
Work complete. All disturbed soil stabilized.
CAS
#460
ESC06-01156 Site Final5/7/20085/7/20085/7/2008 2:02:44 PMPPASS
Work complete. All disturbed soil stabilized.
CAS
#460
ESC05-01626 Site Preparation5/7/20085/7/20085/7/2008 2:02:13 PMPPASS
Work complete. All disturbed soil stabilized.
CAS
#460
ESC04-01307 Site Final5/7/20085/7/20085/7/2008 2:00:49 PMPPASS
Work completed
CAS
#460
ESC04-00854 Site Final5/7/20085/7/20085/7/2008 1:59:49 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00415 Site Final5/7/20085/7/20085/7/2008 1:56:12 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00406 Site Final5/7/20085/7/20085/7/2008 1:55:08 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00407 Site Final5/7/20085/7/20085/7/2008 1:54:37 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00408 Site Final5/7/20085/7/20085/7/2008 1:54:02 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00414 Site Final5/7/20085/7/20085/7/2008 1:53:30 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00414 Site Final5/7/20085/7/20085/7/2008 1:52:35 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00413 Site Final5/7/20085/7/20085/7/2008 1:52:05 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00417 Site Final5/7/20085/7/20085/7/2008 1:51:37 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00410 Site Final5/7/20085/7/20085/7/2008 1:50:35 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00411 Site Final5/7/20085/7/20085/7/2008 1:49:56 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00412 Site Final5/7/20085/7/20085/7/2008 1:49:25 PMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00412 General Inspection5/7/20085/7/20085/7/2008 1:43:38 PMPPASS
Moved to a site final
CAS
#460
ESC06-01299 General Inspection5/7/20085/7/20085/7/2008 11:47:12 AMPPASS
No issues present.
CAS
#460
ESC04-00561 Site Final5/7/20085/7/20085/7/2008 10:43:50 AMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC04-00153 Site Final5/7/20085/7/20085/7/2008 10:41:30 AMPPASS
Work has stopped after forms were pour for foundation. Site has full vegitation
CAS
#460
ESC07-01203 BMP Violation5/7/20085/7/20085/7/2008 10:34:56 AMAPART
Still need to dispose of trash in bin and surrounding it. All other issues with the NOC was corrected.
CAS
#460
ESC03-01112 Site Final5/7/20085/7/20085/7/2008 10:33:43 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC03-00595 Site Final5/7/20085/7/20085/7/2008 10:33:15 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC03-01558 Site Final5/7/20085/7/20085/7/2008 9:23:43 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC03-01558 Site Final5/7/20085/7/20085/7/2008 9:22:35 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC04-01452 Site Final5/7/20085/7/20085/7/2008 9:19:06 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-00500 Site Final5/7/20085/7/20085/7/2008 9:10:39 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC03-01124 Site Final5/7/20085/7/20085/7/2008 9:07:09 AMPPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC08-00006 Site Preparation5/7/20085/7/20085/7/2008 8:59:48 AMAPART
Sign posted at front of lot. Need to have a designated concrete washout pit constructed and also a proper construction entrance.
CAS
#460
ESC06-01222 Site Final5/7/20085/7/20085/7/2008 8:45:52 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC06-01291 Site Final5/7/20085/7/20085/7/2008 8:45:19 AMAPASS
Lot stabilized. All landscape is complete.
CAS
#460
ESC07-01264 General Inspection5/7/20085/7/20085/7/2008 8:38:52 AMAPASS
Site looks good. Getting ready to pave streets.
CAS
#460
ESC07-01280 General Inspection5/7/20085/7/20085/7/2008 8:37:47 AMAPASS
Site looks good. Getting ready to pave streets.
CAS
#460
ESC08-00143 General Inspection5/7/20085/7/20085/7/2008 8:22:00 AMAPASS
site looks good. No issues present.
CAS
#460