MIS09-00078
| BLD-Conference | 5/6/2009 | 5/6/2009 | | P | |
|
|
Determine bond amount for SFD.....Bob is this for you or Tom?
|
MIS09-00078
| DOC - Permit Finaled | 5/7/2009 | 5/7/2009 | 5/7/2009 1:47:30 PM | P | PASS |
|
|
$5000.00 Demo bond ammount.
|
MIS08-00102
| BLD-Conference | 5/7/2009 | 5/7/2009 | 5/7/2009 12:00:00 AM | A | PART |
|
|
Phone conference with owners. They are unable to abate the structure by either demolition or engineered stabalization citing the current economic situation, other variables and possibly filing Chapter 11. Discussions with administration on method of proceeding underway. Demoltion costs 5K-40K or engineered stabilization 20K.
|