ESC10-00008
| Site Preparation | 4/30/2010 | 5/7/2010 | 5/7/2010 3:14:20 PM | P | NR |
|
|
No sign of start up on the project, will re-inspect in a week.
|
ESC10-00185
| Site Preparation | 5/4/2010 | 5/7/2010 | 5/7/2010 2:28:43 PM | A | PASS |
|
|
Sign is posted, de-watering is occurring and discharge is clear. Reviewed concrete washout procedures with contractor.
|
ESC10-00319
| Site Preparation | 5/7/2010 | 5/7/2010 | 5/7/2010 7:43:40 AM | | CANC |
|
|
Passed by inspector 316 on 5/5/10
|