ESC10-00052
| Tracking Control | 5/7/2010 | 5/7/2010 | 5/7/2010 2:52:55 PM | P | FAIL |
|
|
Verbal to RP: Maintain access co ntrol at the North west end of project area. Willre-inspect on 5/11/10am
|
ESC10-00243
| Site Preparation | 5/3/2010 | 5/7/2010 | 5/7/2010 1:54:16 PM | A | FAIL |
|
|
Message to RP: Post ESC sign where visable from Law St. Also protect all storm drain inlets. Will re-inspect on 05/10/10
|
ESC10-00167
| Site Preparation ESC | 5/7/2010 | 5/7/2010 | 5/7/2010 10:57:51 AM | | PASS |
|
|
No need to protect storm drain since they installing a new seepage bed.
|
ESC10-00339
| Site Preparation | 5/7/2010 | 5/7/2010 | 5/7/2010 10:32:34 AM | | PART |
|
|
Message to RP: Post ESC sign where it is visable from the street. Will re-inspect on 5/10/10
|
ESC08-00933
| General Inspection ESC | 5/7/2010 | 5/7/2010 | 5/7/2010 10:15:06 AM | | DONE |
|
|
|
ESC10-00365
| Site Preparation | 5/7/2010 | 5/7/2010 | 5/7/2010 10:10:18 AM | | PART |
|
|
Either remove or re-install sediment barrier per manufactures specs.
|
ESC08-00933
| DOC - Permit Finaled | 5/7/2010 | 5/7/2010 | 5/7/2010 9:22:01 AM | P | PASS |
|
|
|