ESC12-00328
| Site Preparation | 4/30/2012 | 4/30/2012 | | | |
|
|
|
MEC10-04188
| Mec-Aging Inspection | 5/7/2012 | 5/7/2012 | 5/7/2012 5:09:15 PM | | PEND |
|
|
i called and left michelle 2 messages to call me
|
MEC12-01217
| Final | 5/7/2012 | 5/7/2012 | 5/7/2012 5:06:37 PM | P | PASS |
|
|
Pressure test only, thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas...20lb gas to future pool htr ok
|
MEC12-01369
| Rough-in | 5/7/2012 | 5/7/2012 | 5/7/2012 5:02:10 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC12-01335
| Final | 4/30/2012 | 5/7/2012 | 5/7/2012 5:01:46 PM | P | PASS |
|
|
LATE PM PLEASE IF POSSIBLE, THANKS SHANNON Phone #: ###-#### >> Inspection requested via web by Shannon Wells
|
MEC12-01434
| Rough-in | 5/6/2012 | 5/7/2012 | 5/7/2012 5:01:25 PM | P | PASS |
|
|
Rough-In HVAC inspection with gas pressure test and Fireplace inspection. Phone #: ###-#### >> Inspection requested via web by Russ Curtis...r/i and duct blaster ok....20lb gas ok
|
MEC12-01128
| Final | 5/7/2012 | 5/7/2012 | 5/7/2012 5:00:39 PM | P | DONE |
|
|
|
MEC12-01356
| Final | 5/1/2012 | 5/7/2012 | 5/7/2012 4:59:55 PM | P | PASS |
|
|
late pm please do rough in and final any questions call Travis Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
MEC12-01356
| Rough-in | 5/1/2012 | 5/7/2012 | 5/7/2012 4:59:22 PM | P | PASS |
|
|
late pm please do rough in and final any questions call Travis Phone #: ###-#### >> Inspection requested via web by Diane Myslivy
|
ESC12-00243
| Tracking Control | 5/4/2012 | 5/7/2012 | 5/7/2012 4:10:08 PM | A | PASS |
|
|
drive by and check job ...cleaned up
|
MEC12-01414
| Rough-in | 5/6/2012 | 5/7/2012 | 5/7/2012 4:09:00 PM | A | PART |
|
|
Inspector to witness Blast Test at 11am. Please call Brad at ###-#### if any questions. Phone #: ###-#### >> Inspection requested via web by Brad Allison...r/i and duct blaster ok...re-test all gas line
|
MEC12-01407
| Final | 5/3/2012 | 5/7/2012 | 5/7/2012 11:55:21 AM | A | FAIL |
|
|
Call Eric @ ###-#### with any installation issues/questions. Phone #: ###-#### >> Inspection requested via web by Angie maguire...need to wrap line-set in a protective sleeve, it's laying on the ground
|
MEC12-01371
| Final | 5/7/2012 | 5/7/2012 | 5/7/2012 11:45:25 AM | A | PASS |
|
|
|
MEC12-01208
| Rough-in | 5/7/2012 | 5/7/2012 | 5/7/2012 11:06:48 AM | A | PASS |
|
|
doug ###-####...ok for cover
|
MEC12-01208
| Final | 5/7/2012 | 5/7/2012 | 5/7/2012 11:06:21 AM | A | NR |
|
|
rescheduled for a r/i
|
MEC12-01429
| Final | 5/7/2012 | 5/7/2012 | 5/7/2012 10:50:49 AM | A | PASS |
|
|
gas only to bbq
|
MEC12-01429
| Pressure Test | 5/4/2012 | 5/7/2012 | 5/7/2012 10:50:30 AM | A | PASS |
|
|
installer alberto ###-#### please inspect late a.m. Phone #: ###-#### >> Inspection requested via web by Dustin Rich...20lb u/g gas ok..
|
MEC11-03942
| Final | 5/4/2012 | 5/7/2012 | 5/7/2012 10:49:28 AM | A | PASS |
|
|
home phone, call when on way. this was installed back in December & wasn''t home on first inspection Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
GCM12-00070
| GCM-Rough-in | 5/3/2012 | 5/7/2012 | 5/7/2012 9:47:25 AM | A | PART |
|
|
Mark @ ###-#### As early as possible please...100lb test on hydronics to outside of building ok...ok to cover trench with sand
|
MEC11-03971
| Mec-Aging Inspection | 5/7/2012 | 5/7/2012 | 5/7/2012 7:43:27 AM | | PEND |
|
|
bill will call the g/c and then schedule for a final
|
ESC12-00275
| Site Preparation | 5/7/2012 | 5/7/2012 | | | |
|
|
|