BLD13-03382
| BLD-Ceiling Grid Inspection | 5/7/2014 | 5/7/2014 | 5/7/2014 3:54:20 PM | P | PASS |
|
|
Marvin Phone #: ###-####
|
BLD14-01074
| BLD-Final | 5/7/2014 | 5/7/2014 | 5/7/2014 2:48:54 PM | P | PASS |
|
|
|
BLD14-00119
| BLD-Other | 5/7/2014 | 5/7/2014 | 5/7/2014 2:02:25 PM | P | PART |
|
|
Masonary around 3 - Ross Phone #: ###-#### pending spec insp
|
BLD13-02027
| BLD-Conference | 5/7/2014 | 5/7/2014 | 5/7/2014 1:41:21 PM | P | CANC |
|
|
|
BLD14-00801
| BLD-Final | 5/6/2014 | 5/7/2014 | 5/7/2014 11:27:27 AM | A | NR |
|
|
Don Phone #: ###-####
|
BLD14-00800
| BLD-Final | 5/6/2014 | 5/7/2014 | 5/7/2014 11:27:09 AM | A | NR |
|
|
Don Phone #: ###-####
|
BLD14-01074
| BLD-Final | 5/6/2014 | 5/7/2014 | 5/7/2014 10:21:09 AM | A | NR |
|
|
Dorian Phone #: ###-####
|
BLD14-00462
| BLD-Wall Bracing | 5/6/2014 | 5/7/2014 | 5/7/2014 10:16:43 AM | A | PASS |
|
|
call before // shear and a hangar//Tim Phone #: ###-####
|
BLD14-00462
| BLD-Framing/Rough-in | 5/7/2014 | 5/7/2014 | 5/7/2014 10:16:29 AM | P | PASS |
|
|
call before // shear and a hangar//Tim Phone #: ###-####
|
MIS14-00097
| BLD-Conference | 5/6/2014 | 5/7/2014 | 5/7/2014 10:15:32 AM | A | FAIL |
|
|
complaint doing work without permit; remodel inside including elec, plm, mech. Changed utility room into bathroom and moved utility room to basement, kitchen remodel changed flat ceiling to vaulted ceiliing. Electrical concerns with appears to have removed false drop ceiling did not touch struc framing needs permit for laundry room framing sheet rocked over lath and plaster ceilings ok. un permitted additions done years ago
|