Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00344 Random Inspection5/7/20145/7/20145/7/2014 4:29:09 PMPFAIL
Stockpile up hill from end of Windsong is not associated with any active permit. Construction entrance to area is already installed and in good condition. Just needs to be permitted and tacified if it is to stay in that location.

Had a meeting with developer/RP Jeff Snyder who agreed that stockpile should be permitted and he stated he would get a ESC general permit.

Needs to have permit by the end of Thursday 5/8.
ESC13-01132 General Inspection5/7/20145/7/20145/7/2014 3:56:22 PM PASS
Finalized.
ESC13-01132 DOC - Permit Finaled5/7/20145/7/20145/7/2014 3:55:56 PMPPASS
Project complete and stabilized. ESC permit conditions finaled. All other permits are finaled.
ESC13-01186 Site Final5/7/20145/7/20145/7/2014 3:40:15 PMPFAIL
RP listed on application was not utilized according to Paul Lawson. Need to have them sweep up back lot so sediment doesn't go to street. Will inspect again tomorrow.
ESC13-01186 General Inspection5/7/20145/7/20145/7/2014 3:35:05 PM FAIL
Need to sweep parking lot where irrigation trench was installed.
ESC14-00036 General Inspection5/7/20145/7/20145/7/2014 3:06:27 PM PASS
ESC14-00200 Random Inspection5/7/20145/7/20145/7/2014 2:24:29 PMPPASS
Went to check on conditions at site when in the area. Silt fence perimeter is in good conditions vegetated buffer between 10 mile creek. Construction entrance is to be removed and paved once utilities are installed (next week per site superintendant/RP. No corrections at this time.
ESC13-00339 General Inspection5/7/20145/7/20145/7/2014 1:54:41 PM PASS
Permit finaled. See activity notes.
ESC13-00339 DOC - Permit Finaled5/7/20145/7/20145/7/2014 1:53:48 PMPPASS
Vegetation (grass) has established greater than 70% in disturbed area around stormwater infiltration swale that intercepts runoff from entering 10 mile creek wetland area. Contruction is also complete, but BLD permit is open due to provide firelane round entire building.

ESC permit conditions satisfied.
ESC14-00093 Random Inspection5/7/20145/7/20145/7/2014 1:38:23 PMPPEND
No activity or currrent violations at site. Need to pay new erosion control waiver/variance fee for second phase of project (BLD plans are under review).
ESC13-01182 General Inspection5/7/20145/7/20145/7/2014 1:30:58 PM PASS
No discharges or sediment runoff from site observed. The site is next to a gravel pit, so unclear if all stockpiles are from this construction project. No trackout to Targhee. Approved.
ESC12-00403 Random Inspection5/7/20145/7/20145/7/2014 11:57:51 AMPPASS
Checked MS4 outlet pipe to Boise River on 9th Street. No visible plume of sediment or discoloration observed. JUMP is currently in process of dewatering to the MS4 and has two sediment settling tanks.
ESC14-00230 Site Preparation5/7/20145/7/20145/7/2014 11:38:01 AMPPASS
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

Permit posted. Spoke with RP about continuous BMP maintenance. Adjacent houses under way. Stockpile for basement is on adjacent lot, which is under RH#5 permit, and also will soon have its own ESC permit. Approved.
ESC13-00577 Aging Inspection5/7/20145/7/20145/7/2014 11:22:55 AM PASS
Remodel project is in progress. No violations observed.
ESC13-01221 DOC - Permit Finaled5/7/20145/7/20145/7/2014 11:12:21 AMPPASS
ESC conditions met. See activity notes.
ESC13-01221 General Inspection5/7/20145/7/20145/7/2014 11:11:15 AM PASS
ESC conditions satisfied. TIlted Kilts is open for business. BLD permits finaled except the interior demolition permit and the monument sign permit. No futher ESC inspections required.
ESC13-00541 Aging Inspection5/7/20145/7/20145/7/2014 11:02:40 AM PASS
WIP. No ESC violations observed.
ESC13-00920 DOC - Permit Finaled5/7/20145/7/20145/7/2014 10:56:34 AMPPASS
DI bag on Coston has been removed as requested. All ESC permit conditions have now been met.
ESC14-00075 General Inspection5/7/20145/7/20145/7/2014 10:48:29 AM PASS
Exterior work and trenching is complete. Mostly interior work remains to use and heat exchange system to heat the pool. DI protection in place, permit posted.
ESC14-00081 General Inspection5/7/20145/7/20145/7/2014 9:52:29 AM PART
Need DI bag or sediment mat at DI on Windsong just below Mesa Verde on the left. Permit posted, minimal trackout to be swept at end of day.
ESC14-00284 Site Preparation5/6/20145/7/20145/7/2014 9:29:38 AMAPASS
Eric Phone #: ###-####

Permit posted. BMPs set up per plan. Wattles trenched in at toe of slope, vegetative buffer preserved. DI protection. No rock entrance yet, but not yet required. Will continue to monitor.