GCE15-00051
| GCE-Permanent Service | 5/6/2015 | 5/7/2015 | 5/8/2015 11:37:16 AM | A | PASS |
|
|
Jim ###-#### p/s o/h rec ok
|
ELE15-01345
| Final | 5/7/2015 | 5/7/2015 | 5/7/2015 2:35:34 PM | P | PASS |
|
|
Mike// please call before for access Phone #: ###-#### quick disco. and ul listed ballasts final ok
|
ELE15-01344
| Final | 5/7/2015 | 5/7/2015 | 5/7/2015 2:30:29 PM | P | PASS |
|
|
Mike// please call before for access Phone #: ###-#### lighting retro with quick disco. and ul listed ballasts final ok
|
ELE15-00118
| Final | 5/7/2015 | 5/7/2015 | 5/7/2015 2:00:51 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by michael hunt floor heat t stat not installed, open vanity light box needs finished., no power to heat pump Everything else ok
|
ELE15-01066
| Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 1:31:41 PM | P | PASS |
|
|
Garage Addition - inspect for cover, inspect sub-panel fed from main panel, inspect exterior house garage lights, inspect 3-way switching from new garage to house. Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta r/i garage and three way switching and sub panel ok
|
GCE14-00189
| GCE-Final | 5/6/2015 | 5/7/2015 | 5/7/2015 11:56:33 AM | P | PASS |
|
|
Richard ###-#### - requested call ahead (Contractor) Laura ###-#### final ok
|
ELE15-01330
| Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 11:11:26 AM | A | PASS |
|
|
We are requesting a wall rough-in inspection for tomorrow 5/7/15. Our onsite contact is Rod @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate "Greenbelt Store" r/i walls ok
|
ELE15-00146
| Final | 5/5/2015 | 5/7/2015 | 5/7/2015 11:09:26 AM | A | PASS |
|
|
Crossgrains Final Contact Darby Talbot Phone #: ###-#### Inspection requested via web by Cathy Duchek final ok
|
ELE15-01053
| Final | 5/5/2015 | 5/7/2015 | 5/7/2015 11:08:24 AM | A | PASS |
|
|
Cafe Del Sol Final Inspection Contact Darby Talbot Phone #: ###-#### Inspection requested via web by Cathy Duchek final ok
|
ELE14-03336
| Electrical Rough-In | 5/7/2015 | 5/7/2015 | 5/7/2015 9:21:12 AM | A | PASS |
|
|
Contact: Jeremy Thornock Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok level 4 wing 1 rm. soffits
|
ELE14-03246
| Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 8:49:56 AM | A | PASS |
|
|
Dave. Soffit cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i ok elevator lobby ceilings on all levels in tower 1
|
GCE15-00051
| GCE-Final | 5/6/2015 | 5/7/2015 | 5/7/2015 7:59:19 AM | A | PASS |
|
|
Jim ###-#### final ok
|
ELE15-02131
| Electrical Rough-In | 5/6/2015 | 5/7/2015 | 5/7/2015 12:00:00 AM | A | PASS |
|
|
3rd floor shafts, drop down ceilings 2nd floor, corridor MC 2nd and 3rd floors. Phone #: ###-#### Inspection requested via web by Rafael Castillo east wing rm. soffits rm. 210 and 207 r/i ok Note:west half of bldg. roof not dryed in yet. No nm cable can be installed yet.
|