BLD11-02043
| BLD-Aging Inspection | 5/7/2015 | 5/7/2015 | 5/12/2015 6:44:22 AM | | PEND |
|
|
|
BLD15-00526
| BLD-Final | 5/6/2015 | 5/7/2015 | 5/11/2015 8:17:16 AM | A | PASS |
|
|
Lincoln Phone #: ###-#### ok to final I reveiwed submitted engineering everything checkes out .
|
BLD13-03405
| BLD-Wall cover | 5/7/2015 | 5/7/2015 | 5/8/2015 6:56:29 AM | P | PASS |
|
|
Soffit framing in tower 1 at elevator 3 lobbies, soffit framing tower 3 corridors. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD14-02406
| BLD-Other | 5/7/2015 | 5/7/2015 | 5/8/2015 6:55:15 AM | P | PASS |
|
|
level 4 Soffit inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD15-01079
| BLD-Footing | 5/7/2015 | 5/7/2015 | 5/8/2015 6:54:01 AM | P | PASS |
|
|
John Phone #: ###-####
|
BLD15-00938
| BLD-Wall Bracing | 5/7/2015 | 5/7/2015 | 5/7/2015 2:00:42 PM | P | PASS |
|
|
Chris Phone #: ###-####
|
BLD15-00781
| BLD-Framing/Rough-in | 5/6/2015 | 5/7/2015 | 5/7/2015 1:28:51 PM | A | DONE |
|
|
Dan Phone #: ###-####
|
BLD15-00265
| BLD-Energy code compliance | 5/6/2015 | 5/7/2015 | 5/7/2015 1:11:12 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD15-00781
| BLD-Framing/Rough-in | 5/6/2015 | 5/7/2015 | 5/7/2015 1:10:06 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD13-03405
| BLD-Wall cover | 5/7/2015 | 5/7/2015 | 5/7/2015 10:47:58 AM | A | NR |
|
|
Soffit framing at elevator #3 lobbies all floors. Phone #: ###-#### Inspection requested via web by Tim Toups
|