Inspections for the day of: Thursday, May 7, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00036 INSP-Supply line flush5/6/20155/7/20155/7/2015 4:51:41 PMPPASS
Supply line flush completed satisfactory. Rough in inspection completed, ok to cover with the following exceptions: missing drop/ceiling grid, 4 missing hangars, 1 overspaced sprinkler and 2 missed coverage areas requiring additional head. Marked plan sheet with locations.
BLD14-02838 FIRE-Final Inspection5/6/20155/7/20155/7/2015 4:47:00 PMADEFR
Was not able to make due to inspection load, rescheduled.
BLD14-02885 FIRE-Final Inspection5/6/20155/7/20155/7/2015 4:45:32 PMADEFR
Was not able to make due to inspection load, rescheduled.
BLD15-00403 FIRE-Final Inspection5/7/20155/7/20155/7/2015 4:36:46 PMPPASS
Fire life safety passed.
BLD14-01628 FIRE-Final Inspection5/6/20155/7/20155/7/2015 4:01:23 PMAPART
Partial fire life safety pass for new portion of building. Items to fix before final: new inspection tags on 2 fire extinguishers, hang fire extinguisher located by electrical panels, complete install of emergency exit sign at side middle door, and fix back middle door that is jammed. Permit cannot be finaled until fire suppression tie in of existing building system is completed.
FIR14-00529 INSP-Final Inspection5/7/20155/7/20155/7/2015 1:39:18 PMPPART
Riser 4: accelerator installed, flow test passed at 27 sec. Partial final complete, new facility systems complete.
BLD14-02264 FIRE-Final Inspection5/6/20155/7/20155/7/2015 11:48:17 AMANR
FIR14-00743 and FIR14-00711 permits need to be finaled before life safety can be completed.
GCB14-00099 FIRE-Conference5/6/20155/7/20155/7/2015 11:25:14 AMADONE
Walkthough with PM and General Contractor. Discussed requirements for possible temporary occupancy (full shell and core protection, system monitoring, fire department access, and adequate egress/exit access). Discussed that original idea to first fire wall would not satisfy exit access, so common area would need to be complete as well.