Inspections for the day of: Thursday, May 7, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00724 General Inspection5/7/20155/7/20155/7/2015 1:41:34 PM PASS
ESC14-00711 General Inspection5/7/20155/7/20155/7/2015 10:29:32 AM PASS
still waiting for re-vegetation to be established
ESC14-00267 General Inspection5/7/20155/7/20155/7/2015 9:54:26 AM PASS
WIP: 2nd and 3rd floors of the Annex Garages are currently under construction. Work along 6th street is also in progress.
No ESC issues at this time.
ESC14-01078 Site Final5/5/20155/7/20155/7/2015 8:59:45 AMAPASS
Call 30 mintues prior if you would like me to meet you there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
ESC14-01078 DOC - Permit Finaled5/7/20155/7/20155/7/2015 8:59:24 AMPPASS
Staging area complete. All materials/BMP's and permit has been removed.
ESC Conditions Met
ESC14-00179 Site Preparation5/6/20155/7/20155/7/2015 8:41:45 AMAPASS
Robert Phone #: ###-####

Permit posted in front of lot on metat post: Existing concrete washout from previous townhome construction. Lot is extremely flat, and at a lower elevation than other lots.
Approved to begin construction
ESC14-00277 Site Preparation5/6/20155/7/20155/7/2015 8:41:18 AMAPASS
Robert Phone #: ###-####

Permit posted in front of lot on metat post: Existing concrete washout from previous townhome construction. Lot is extremely flat, and at a lower elevation than other lots.
Approved to begin construction