Inspections for the day of: Monday, May 7, 2018.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-00711 FIRE-Final Inspection5/4/20185/7/20185/7/2018 2:48:15 PMAFAIL
Provide panic hardware on both of the exit doors as shown on the city approved plans

Devin Phone #: ###-####
FIR17-00522 INSP-Sprinkler Rough-in5/4/20185/7/20185/7/2018 1:52:24 PMPPASS
dining area and high part of lobby is ok for cover. See the city approved plans for notations with todays date.
BLD18-01070 FIRE-Final Inspection5/4/20185/7/20185/7/2018 1:15:10 PMPFAIL
Repair the exit sign at the south exit, repair the emergency light in the Dining area, provide single action lever hardware for both restroom doors.

Rachel Phone #: ###-####
FIR18-00366 INSP-Final Inspection5/6/20185/7/20185/7/2018 9:44:28 AMAPASS
Permit finaled
BLD17-03922 FIRE-Final Inspection5/4/20185/7/20185/7/2018 9:44:04 AMAPASS
Life safety passed

Brandon Phone #: ###-####
FIR18-00093 INSP-Sprinkler Rough-in5/4/20185/7/20185/7/2018 7:48:56 AMAPASS
Sprinkler protection in the coolers and freezers is complete. Project appears ready for a final.

Roy Nelson Phone #: ###-#### Inspection requested via web by Brodie Stenquist