BLD18-00065
| FIRE-Final Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 2:08:14 PM | P | PASS |
|
|
Shunt trip for elevator and door release under active fire alarm complete. Final life fire safety inspection for area of work complete.
|
FIR18-00018
| INSP-Final Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 1:24:37 PM | P | PASS |
|
|
Fire sprinkler monitoring has been interfaced with the newly installed fire alarm system, this permit is finaled.
|
FIR18-00249
| INSP-Final Inspection | 5/3/2018 | 5/7/2018 | 5/7/2018 1:23:33 PM | P | PASS |
|
|
Final fire alarm inspection for area of work complete.
Final Fire Alarm Inspection Thanks Jason Phone #: ###-#### Inspection requested via web by Neal Timmerman
|
BLD17-03243
| FIRE-Final Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 12:59:54 PM | P | PASS |
|
|
Shunt trip for elevator and door release under active fire alarm complete. Final life fire safety inspection for area of work complete.
|
BLD18-00706
| FIRE-Final Inspection | 5/7/2018 | 5/7/2018 | 5/7/2018 12:56:32 PM | P | PASS |
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in place with current inspection tags, maximum occupancy placards will be placed in discussed locations, life fire safety inspection for this permitted area complete.
Please call 10 min. prior to being on site so I can have some travel time to ensure I''m on time to meet you. Phone #: ###-#### Inspection requested via web by Justin Schwartz
|
FIR18-00256
| INSP-Sprinkler Rough-in/Hydro | 5/4/2018 | 5/7/2018 | 5/7/2018 11:33:54 AM | A | PART |
|
|
24 hour air test started at 1030AM with 50 psi.
air test Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
FIR18-00051
| INSP-Sprinkler Rough-in/Hydro | 5/4/2018 | 5/7/2018 | 5/7/2018 10:01:15 AM | A | CANC |
|
|
Hydrostatic test cancelled per point of contact, hydro will be rescheduled for a later date.
Jon Beazer is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|