BLD19-01423
| BLD-Final | 5/6/2019 | 5/7/2019 | 5/8/2019 7:19:30 AM | P | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD19-00142
| BLD-Foundation | 5/7/2019 | 5/7/2019 | 5/8/2019 7:19:09 AM | P | PASS |
|
|
South Entry Phone #: ###-#### Inspection requested via web by Doug Storey
|
BLD19-00440
| BLD-Foundation | 5/7/2019 | 5/7/2019 | 5/8/2019 7:18:49 AM | P | PASS |
|
|
As early as possible Phone #: 2088032242 >> Inspection requested via mobile web by Mike Tracy
|
BLD19-00130
| BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 3:02:37 PM | P | PASS |
|
|
Zack Phone #: ###-####
|
BLD19-00491
| BLD-Framing/Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 2:15:37 PM | A | PASS |
|
|
Blaine Phone #: ###-####
|
BLD18-02903
| BLD-Framing/Rough-in | 5/3/2019 | 5/7/2019 | 5/7/2019 2:15:21 PM | A | PART |
|
|
Justin-partial on lower soffits to cover Phone #: ###-#### ok all but for lagger needs to have lags screws added
|
BLD18-00614
| BLD-Framing/Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 1:04:50 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall ok to insulate but need to fire block at floor over openning between front rm and kitchen /over header
|
BLD18-00638
| BLD-Blower Door Test Results | 5/7/2019 | 5/7/2019 | 5/7/2019 12:23:07 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 4.3
|
BLD18-00638
| BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 12:22:42 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall no code complant windows out of bed rooms openning to small in master and window sills to high in the other two
|
BLD18-03975
| BLD-Footing | 5/6/2019 | 5/7/2019 | 5/7/2019 12:22:42 PM | P | PART |
|
|
Pat Phone #: ###-#### setback ok forms in rebar at80% ok
|
BLD18-03657
| BLD-Framing/Rough-in | 5/6/2019 | 5/7/2019 | 5/7/2019 11:35:13 AM | A | PART |
|
|
Shane Phone #: ###-#### ok to cover rlec and it room and top 4ft of walls
|
BLD18-02566
| BLD-Concrete | 5/6/2019 | 5/7/2019 | 5/7/2019 11:05:58 AM | A | PASS |
|
|
Ed- rebar Phone #: ###-####
|
BLD18-03479
| BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 12:00:00 AM | P | PASS |
|
|
per Dave H. over the phone, inspection pass
Zack Phone #: ###-####
|