ELE20-01555
| Final | 5/6/2020 | 5/7/2020 | 5/8/2020 4:29:12 AM | P | PASS |
|
|
Please call our installer Aric on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks Ok final. 20a max fuse, 20a brkr installed.
|
ELE19-00947
| Final | 5/6/2020 | 5/7/2020 | 5/7/2020 1:57:11 PM | P | PART |
|
|
Partial Final Phone #: ###-#### Inspection requested via web by Andy Chambers Partial for area 2B and kitchen.
|
ELE20-01371
| Electrical Rough-In | 5/7/2020 | 5/7/2020 | 5/7/2020 1:03:15 PM | P | PASS |
|
|
There will be someone home. My tech does have a video of the work as well. If you have any questions please feel free to contact Tony ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok cover. Reconfigured mstr bath. Added dedicated circuit for bath GFI
|
ELE20-01561
| Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/7/2020 12:13:31 PM | P | PASS |
|
|
Please contact at the number listed above prior to inspection Phone #: ###-#### Inspection requested via web by Cortney Hopper Ok cover bath. 1 new 20a circuit was run to power basement bath recept and everything inside bath. Also power was added for sump pump.
|
ELE20-00884
| Electrical Rough-In | 5/7/2020 | 5/7/2020 | 5/7/2020 12:11:47 PM | P | PASS |
|
|
Kevin *screened* Phone #: ###-#### Ok cover wires in floor of existing deck location. This area is going to be framed in and used as livable space.
|
ELE20-01567
| Final | 5/7/2020 | 5/7/2020 | 5/7/2020 11:19:27 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steven Ragan Ok final.
|
ELE20-01567
| Permanent Service | 5/7/2020 | 5/7/2020 | 5/7/2020 11:19:13 AM | P | PASS |
|
|
Emergency service change already energized.
|
ELE20-01526
| Rough-In Permanent Service | 5/6/2020 | 5/7/2020 | 5/7/2020 11:02:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Richard Gratiot Ok cover. p/s o/h n ok
|
ELE19-04797
| Conference | 5/6/2020 | 5/7/2020 | 5/7/2020 10:33:34 AM | A | DONE |
|
|
Mark *screened* video/phone call ok Phone #: ###-#### Discussed service location by window. Ok in this location.
|
ELE20-00262
| Final | 5/6/2020 | 5/7/2020 | 5/7/2020 10:32:57 AM | A | PASS |
|
|
Please call 30 minutes before arrival to site. Phone #: ###-#### Inspection requested via web by Rylin Dukes Ok final. No 110v in cabinet. Plug-in transformer powers cabinet.
|
ELE20-01358
| Permanent Service | 5/6/2020 | 5/7/2020 | 5/7/2020 9:48:29 AM | A | PASS |
|
|
need a sticker on the meter Phone #: ###-#### Inspection requested via web by Greg Idsinga p/s u/g n ok
|
ELE20-01303
| Permanent Service | 5/7/2020 | 5/7/2020 | 5/7/2020 9:45:06 AM | P | CANC |
|
|
There will be guys there working. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### >> Inspection requested via web by Clayton Morgan Inspection cancelled from web by: Clayton Morgan
|
ELE20-01304
| Permanent Service | 5/7/2020 | 5/7/2020 | 5/7/2020 9:39:12 AM | P | CANC |
|
|
There will be guys there working. If you have any questions please feel free to contact Fred ###-####. Thanks!! Phone #: ###-#### >> Inspection requested via web by Clayton Morgan Inspection cancelled from web by: Clayton Morgan
|
ELE20-01522
| Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/7/2020 9:36:44 AM | A | PASS |
|
|
Bonding only (swimming pool) Phone #: ###-#### Inspection requested via web by Kevin Koomler Ok cover 4 corners, 1 HV light N side.
|
ELE20-01561
| Electrical Rough-In | 5/6/2020 | 5/7/2020 | 5/6/2020 3:40:47 PM | P | CANC |
|
|
Please contact at the number above prior to inspection Phone #: ###-#### >> Inspection requested via web by Cortney Hopper Inspection cancelled from web by: Cortney Hopper
|