Inspections for the day of: Thursday, May 7, 2020.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC20-00368 Site Preparation5/7/20205/7/20205/13/2020 5:44:22 PMPPASS
Reviewed ESC BMPs with contractor/RP Jon Binfet. Project within vegetated backyard with stabilzed access.

Approved for construction
ESC19-01767 General Inspection4/23/20205/7/20205/13/2020 5:39:21 PMPCANC
rescheduled
ESC19-00401 General Inspection5/7/20205/7/20205/13/2020 5:38:40 PM CANC
ESC19-01544 General Inspection5/6/20205/7/20205/13/2020 4:18:16 PMAPASS
post permit sign

BMPs installed. No activity at time of inspection. Clean site.
ESC18-01015 Site Final5/6/20205/7/20205/13/2020 2:44:29 PMPPASS
No distrubed area or temp BMP left behind. No recent activity on BLD. ESC finaled.
ESC19-00617 Site Final4/29/20205/7/20205/8/2020 2:25:31 PMPCANC
ESC19-00156 General Inspection5/7/20205/7/20205/8/2020 2:24:57 PM CANC
ESC19-00647 General Inspection5/7/20205/7/20205/8/2020 2:24:29 PM CANC
ESC19-00086 General Inspection5/7/20205/7/20205/8/2020 2:24:14 PM CANC
ESC19-00962 General Inspection5/7/20205/7/20205/8/2020 2:24:07 PM CANC
ESC20-00368 Site Final5/7/20205/7/20205/7/2020 1:17:06 PMPPASS
Demo complete. New garage/shop covered by ESC20-00533
ESC19-00371 Conference5/7/20205/7/20205/7/2020 12:20:07 PMPDONE
Correction requests for updatig ESCP/SWPPP sent to site stormwater team via email.

Corrections need to be submitted by 5/14/2020:
- Update the 1-mile radius receiving waters map, does not show the correct flow route of water from the site
- Update/revise the incorrect information regarding buffer exceptions on page 16
- Update ESC site map showing all current BMPs, areas where stabilization is not yet implemented, and turbidity monitoring locations
- Have all corrective action reports in onsite SWPPP (or send links)
- Have updated turbidity measurement log in appendix L of SWPPP showing past data and a log table to record new data
- Follow notification requirements per the CGP permit information on discharges exceeding WQS to Water of the US. List requirements in SWPPP on turbidity log paperwork.