PLM00-01463
| Plumbing Rough-in | 5/4/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | A | PART |
|
|
call contractor for access-----###-####-rainer howard --r/i
|
PLM00-00234
| Final | 5/5/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/05/2000 at 09:33:10. Contact: ###-####.
|
PLM00-01477
| Plumbing Rough-in | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | PART |
|
|
sam ###-#### floor only 5/9/00 7:37:16 AM
|
PLM00-01279
| Water and/or Sewer | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | PART |
|
|
###-####
|
PLM00-01492
| Groundwork | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | PASS |
|
|
Eric ###-####
|
PLM00-01494
| Water and/or Sewer | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | PASS |
|
|
Tyler ###-####
|
PLM00-01431
| Groundwork | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2000 at 11:06:55. Contact: ###-####.
|
PLM00-00272
| Water and/or Sewer | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | NR |
|
|
|
PLM00-00273
| Water and/or Sewer | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | NR |
|
|
DOUG BAKER 5/8/00 3:04:04 PM
|
PLM00-00271
| Water and/or Sewer | 5/8/2000 | 5/8/2000 | 5/8/2000 12:00:00 AM | P | FAIL |
|
|
Shot grade w rick debest,needed 27.5, had,16.5 in 110ft. gz 5/8/00 3:08:54 PM instructed them to take pipe out regrade to 27.5 call for insp. 5/8/00 3:10:23 PM
|