BLD01-00452
| BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | PART |
|
|
Jeff Inman ###-#### please call 15 minutes before you go out; rec'd resub for entry door & fix for glu lam drilled 5/8/2001 11:43:38 AM
|
BLD00-02347
| BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/8/2001 8:26:24 AM w/ Jim re c/n
|
BLD99-03303
| BLD-Conference | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | PASS |
|
|
###-####; met w/ arch,submit for changes/deletions; appears to be finalled, but reception area was left open. 5/8/2001 11:37:13 AM 5/8/2001 11:40:20 AM
|
BLD01-00492
| BLD-Other | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 11:39:11. Contact: .add perimeter wires, get hvac ok; chk at final 5/8/2001 10:12:30 AM
|
BLD01-00492
| BLD-Other | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 11:39:11. Contact: .add perimeter wires, get hvac ok; chk at final 5/8/2001 10:12:30 AM
|
BLD01-00027
| BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | A | FAIL |
|
|
ceiling grid \\###-#### this has nothing to do with plan mod....add wires,submit clarification as req'd, make fire c/n ok. 5/8/2001 10:08:09 AM
|
BLD01-00807
| BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 15:18:25. Contact: ###-####...struct ok...install lead at door and wall 5/8/2001 2:55:23 PM
|
BLD01-00393
| BLD-Final | 5/7/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | CANC |
|
|
FN --###-####- TERRY--
|
BLD01-00990
| BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
r/i- grivvin ###-#### walls ok 5/8/2001 4:26:12 PM
|
BLD01-00488
| BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
ceiling grid tim- ###-####
|
BLD01-00481
| BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
tim- ###-#### ceiling grid , add wires at lights, secure registers 5/9/2001 11:32:01 AM
|
BLD00-02394
| BLD-Other | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
john ###-#### Reinforcing steel for the roof parapet,,,need eng's ok for wall modification...not shot crete as shown. bar ok. 5/8/2001 3:54:22 PM
|
BLD01-00452
| BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PART |
|
|
jeff ###-####, beam repaired per eng'r 5/8/2001 2:25:19 PM
|
BLD00-00081
| BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/8/2001 3:03:32 PM w/ proj mgr...needeng'r to address discrepancies & missed tests by MTI.
|
BLD00-02062
| BLD-Conference | 5/8/2001 | 5/8/2001 | 5/8/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/8/2001 4:31:22 PM w/westfall re modification/deletion of car park area
|