Inspections for the day of: Wednesday, May 8, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-01298 Rough-In Permanent Service5/7/20025/8/20025/8/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/07/2002 at 11:40:33. Contact: ###-####. cor. posted met with owner 358.30, 250.24(A((5), 210.70 needs light fixture for furnace rm, 200.7 110.3(B) use manufactures breakers, 110,26 clearence for sub panel, 300.14 5/8/2002 2:17:49 PM
ELE02-01251 Temporary Service5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
###-####

t/s o/h new ok 5/8/2002 10:13:11 AM
ELE02-00697 Electrical Rough-In5/7/20025/8/20025/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/07/2002 at 13:12:49. Contact: ###-####. conference only ok 5/8/2002 3:16:15 PM
ELE02-01170 Electrical Rough-In5/7/20025/8/20025/8/2002 12:00:00 AMAPART
WARREN ###-#### walls ok 5/8/2002 10:43:29 AM
ELE02-01340 Final5/7/20025/8/20025/8/2002 12:00:00 AMAFAIL
call first 20 min. for access ###-#### cor. posted called 250.52 or 104 grd or bond, 300.10 bond bushing for all R E washers110.26 clearence dedicated space headrm 230.28 BBC U bolt guy kit, what is grd or bond wire at sub panel, that should all be done p/s 5/8/2002 11:04:43 AM
ELE02-01046 Final5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
###-#### JOHN ok 5/8/2002 11:22:13 AM
ELE02-01177 Final5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/07/2002 at 16:40:06. Contact: ###-####. ok no card at job site 5/8/2002 3:38:08 PM
ELE02-01051 Rough-In Permanent Service5/8/20025/8/20025/8/2002 12:00:00 AMPPASS
###-#### TODD r/i ok

p/s o/h for meter seal only ok 5/8/2002 6:11:46 PM
ELE02-01380 Final5/8/20025/8/20025/8/2002 12:00:00 AMPPART
###-#### chad cover ok all walls and ceiling except under p/s panel 5/8/2002 5:13:45 PM
ELE02-01308 Final5/8/20025/8/20025/8/2002 12:00:00 AMPNR
###-#### owner said contractor will reschedule, floors are wet no access 5/8/2002 3:56:23 PM
ELE02-00863 Electrical Rough-In5/7/20025/8/20025/8/2002 12:00:00 AMPPART
###-#### jeff 2 short walls and ceiling in parts area only 5/8/2002 4:36:16 PM
ELE01-04323 Final5/7/20025/8/20025/8/2002 12:00:00 AMPPASS
###-#### THERRIN ok 5/9/2002 10:27:52 AM