ELE02-00641
| Electrical Rough-In | 5/7/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 11:43:29. Contact: ###-####.
|
ELE02-01364
| Permanent Service | 5/7/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | A | PASS |
|
|
john ###-#### per ser conference - wire bending space in old service not ok, 2" mast, 18" seperate ser.drop and out building, double cond. under lugs. and calculate service for house and out building. 5/8/2002 9:57:14 AM
|
ELE02-01352
| Rough-In Permanent Service | 5/7/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### ROCKY p/s o/h rec - ok 5/8/2002 10:26:03 AM
|
ELE02-01368
| Electrical Rough-In | 5/7/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | A | PASS |
|
|
###-#### JESSE underground for fuel pumps. 5/8/2002 8:43:38 AM
|
ELE02-01307
| Electrical Rough-In | 5/8/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | A | PASS |
|
|
|
ELE01-03949
| Electrical Rough-In | 5/8/2002 | 5/8/2002 | 5/8/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 11:00:03. Contact: ###-####.
|