Inspections for the day of: Wednesday, May 8, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00181 Plumbing Rough-in5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/07/2002 at 13:01:45. Contact: ###-####. main restroom,s on north side and janitor sink area rough-in and test ok 5/8/2002 12:15:53 PM
PLM02-00181 Roof Drains5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/07/2002 at 13:02:30. Contact: ###-####. roof drain,s on south lower roof section water test ok 5/8/2002 12:13:00 PM
PLM02-01204 Water and/or Sewer5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
RAYMOND ###-####
PLM02-01204 Sprinkler (Final)5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
RAYMOND ###-####
PLM01-02494 Final5/7/20025/8/20025/8/2002 12:00:00 AMAPASS
fn dan- ###-####
PLM02-01254 Sprinkler (Final)5/8/20025/8/20025/8/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/08/2002 at 06:30:16. Contact: ###-####. tie in ok to cover need backflow device tested and certified 5/8/2002 10:26:27 AM
PLM02-01254 Water and/or Sewer5/8/20025/8/20025/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/08/2002 at 06:39:03. Contact: ###-####.
PLM02-01249 Sprinkler (Final)5/8/20025/8/20025/8/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/08/2002 at 06:40:28. Contact: ###-####.
PLM02-01227 Plumbing Rough-in5/8/20025/8/20025/8/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/08/2002 at 07:33:21. Contact: ###-####.
PLM02-01296 Final5/8/20025/8/20025/8/2002 12:00:00 AMPPASS
###-####
PLM02-01298 Final5/8/20025/8/20025/8/2002 12:00:00 AMPNR
###-#### DEBBIE
PLM02-00210 Final5/8/20025/8/20025/8/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/08/2002 at 10:45:06. Contact: ###-####. premis protection need,s certified expose floor drain in shop area provide bolt,s for sump lid,s check flush valves in restroom,s may need adjustments called plumbing contractor 5/8/2002 3:08:16 PM
PLM02-01298 Water and/or Sewer5/8/20025/8/20025/8/2002 12:00:00 AMPPART
Scheduled by Inspector: 360 On 5/8/2002 5:42:00 PM water line from control and drain valves to two hydrants in shop area test ok 5/8/2002 5:46:14 PM