ELE06-00404
| ELE-Aging Inspection | 5/8/2006 | 5/8/2006 | 5/9/2006 3:32:08 PM | | DONE |
|
|
see final
|
ELE06-00116
| Permanent Service | 5/8/2006 | 5/8/2006 | 5/8/2006 4:53:02 PM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g n ok
|
ELE06-01538
| Electrical Rough-In | 5/8/2006 | 5/8/2006 | 5/8/2006 4:42:30 PM | P | FAIL |
|
|
jean; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left corr notice, nec 314.20 in walls of combustible material, boxes shall be flush with finished surface,314.17(C) nm cable shall be secured within 8" of box,314.27 box shall be supplied for lighting fixture, 300.4(A) &(D) edge of holes and nm cable shall be 1 1/4" from edge of framing members, 210.52(A) 2' wall in kitchen shall have recpt, entertainment center shall have 3 recpts per plan, 110.12(C) there shall be no damaged wire, 408.38 panel shall be dead-front,BCC all make-up shall be done
|
ELE06-00117
| Permanent Service | 5/8/2006 | 5/8/2006 | 5/8/2006 3:39:55 PM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g n ok
|
ELE06-01581
| Rough-In Permanent Service | 5/6/2006 | 5/8/2006 | 5/8/2006 3:04:05 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/6/2006 at 6:59:52 AM. Contact: ###-####. ric ok, p/s u/g n ok
|
ELE06-01586
| Electrical Rough-In | 5/8/2006 | 5/8/2006 | 5/8/2006 2:27:31 PM | P | PASS |
|
|
Requesting underground inspection.; Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to cover u/g under bldg slab only
|
ELE06-00788
| Final | 5/8/2006 | 5/8/2006 | 5/8/2006 2:15:19 PM | P | PASS |
|
|
###-#### - paul ok to final
|
ELE06-01534
| Final | 5/8/2006 | 5/8/2006 | 5/8/2006 1:43:08 PM | P | PASS |
|
|
CALL IF YOU HAVE ANY ?; Phone #: ###-#### Internet Inspection Request from: Todd Holbrook corr made, ok to final
|
ELE06-01523
| Permanent Service | 5/5/2006 | 5/8/2006 | 5/8/2006 10:11:25 AM | A | CANC |
|
|
Internet Inspection Request from: Tyler Bowen called contr, said permit not up to date, no p/s and only 3 rooms, said to recall when correct
|
ELE06-01577
| Temporary Service | 5/5/2006 | 5/8/2006 | 5/8/2006 9:53:25 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung corr made, t/s o/h n ok
|
ELE06-01598
| Rough-In Permanent Service | 5/5/2006 | 5/8/2006 | 5/8/2006 9:14:04 AM | A | PASS |
|
|
###-#### called contr, left survey, nec 210.70(A)(3) at least 1 lighting outlet shall be installed in furnace room, BCC all make-up shall be done
|
ELE06-00406
| Final | 5/8/2006 | 5/8/2006 | 5/8/2006 8:40:46 AM | A | PASS |
|
|
looked at signs, ok to final
|
ELE05-04207
| Final | 5/5/2006 | 5/8/2006 | 5/8/2006 8:12:17 AM | A | FAIL |
|
|
Final inspection on 05/08/2006. Contact is Greg @ ###-####.; Phone #: ###-#### Internet Inspection Request from: Steve Syltie called contr, left corr notice,348.30 fmc shall be strapped within 12" of box, 110.3(B) listed and labelled equipment shall be installed
|
ELE06-01581
| Final | 5/4/2006 | 5/8/2006 | 5/6/2006 7:01:04 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 5/4/2006 at 2:03:06 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 6 2006 7:01AM.
|