ELE08-00599
| Final | 5/7/2008 | 5/8/2008 | 5/8/2008 12:25:18 PM | A | CANC |
|
|
tool install in fab 1X. SUP05. 7072161 Phone #: ###-#### Internet Inspection Request from: Ken Heller . .1. final ok. . .
|
ELE08-00599
| Electrical Rough-In | 5/8/2008 | 5/8/2008 | 5/8/2008 12:24:49 PM | P | PASS |
|
|
tool install in fab 1X. SUP05. 7072161 Phone #: ###-#### Internet Inspection Request from: Ken Heller . .1. ri ok. . .
|
ELE08-01160
| Rough-In Permanent Service | 5/7/2008 | 5/8/2008 | 5/8/2008 10:33:00 AM | A | PASS |
|
|
changed service, ran new ground wire, bonded hot and cold at water heater, and changed range and dryer pigtale and receptacle. Phone #: ###-#### Internet Inspection Request from: Sean Peltier . .1. p/s o/h reconnect ok. . .
|
ELE08-01141
| Temporary Service | 5/8/2008 | 5/8/2008 | 5/8/2008 9:51:14 AM | P | PASS |
|
|
Temp power Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa . .1. t/s u/g n ok. . ..
|
ELE08-01141
| Final | 5/7/2008 | 5/8/2008 | 5/8/2008 9:47:20 AM | A | CANC |
|
|
Temp power Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa
|
ELE07-03922
| Electrical Rough-In | 5/7/2008 | 5/8/2008 | 5/8/2008 9:27:06 AM | A | PASS |
|
|
BEN MacDONAGH Phone #: ###-#### Internet Inspection Request from: Randy Vail . .1. site lighting conduits ok for cover, entire area. . .
|
ELE08-00287
| Final | 5/7/2008 | 5/8/2008 | 5/8/2008 8:54:06 AM | A | PASS |
|
|
Final Electrical Inspetion neede, please call Clayton @ ###-#### Phone #: ###-#### Internet Inspection Request from: Alison Pennington . .1. final ok--survey note--need to update panel schedule. . .
|
ELE08-01142
| Permanent Service | 5/7/2008 | 5/8/2008 | 5/8/2008 8:32:57 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/7/2008 at 4:03:06 PM. Contact: ###-####. . .1. the new outside equipment/meter pack expansion is ok. . . . .2. no meter is needed for this inspection at this time. . .
|