PLM09-00669
| Water and/or Sewer | 5/8/2009 | 5/8/2009 | 5/8/2009 5:10:46 PM | P | PASS |
|
|
|
PLM09-00669
| Final | 5/8/2009 | 5/8/2009 | 5/8/2009 5:10:36 PM | P | PASS |
|
|
service repair final ok
|
PLM09-00597
| Final | 5/7/2009 | 5/8/2009 | 5/8/2009 1:27:05 PM | P | PASS |
|
|
CONTACT: DEREK COOPER ###-#### Internet Inspection Request from: Ina Schneider
|
PLM09-00486
| Plumbing Rough-in | 5/5/2009 | 5/8/2009 | 5/8/2009 11:59:35 AM | A | PART |
|
|
Frank ###-#### hm. or cell# ###-#### relocating 3"waste and 1 1/2" vent ok, will call for sink rough in.
|
PLM08-02269
| Plumbing Rough-in | 5/7/2009 | 5/8/2009 | 5/8/2009 10:10:57 AM | A | PART |
|
|
Jeff- unit 451 Phone #: ###-#### ri unit 451 ok still need unit 447.
|
ESC09-00210
| Tracking Control | 5/6/2009 | 5/8/2009 | 5/8/2009 9:36:14 AM | A | PART |
|
|
site looks ok needs time to get signs back up after grading, washout pit not posted, etc.
|