BLD09-00647
| FIRE-Final Inspection | 5/8/2009 | 5/8/2009 | 5/11/2009 11:36:52 AM | P | CANC |
|
|
Inspection rescheduled for 5/12 AM per phone call from contractor recieved 5/11.
|
BLD08-01144
| FIRE-Final Inspection | 5/7/2009 | 5/8/2009 | 5/8/2009 12:34:00 PM | A | PASS |
|
|
Fire life safety okayed for final pending satisfactory structural final inspection for doors and hardware incomplete at some locations and finishes at the common exit corridor.
|
BLD09-00087
| FIRE-Final Inspection | 5/8/2009 | 5/8/2009 | 5/8/2009 12:32:04 PM | P | PASS |
|
|
Life safety approved for final per the scope of work.
|
FIR08-00786
| INSP-Alarm Testing | 5/7/2009 | 5/8/2009 | 5/8/2009 12:31:35 PM | A | NR |
|
|
Scheduled by a contractor via Hello! on 5/7/2009 at 4:35:36 PM. Contact: ###-####. Discussed items for final and project schedule.
|
FIR07-01051
| INSP-Final Inspection | 5/7/2009 | 5/8/2009 | 5/8/2009 12:30:43 PM | A | PART |
|
|
Walkthrough with contractor regarding items for final including ceiling finishes and escutcheons at some areas, zone map, signage at aux. drains, repaired flow switches and backflow certification done while on site, need to test riser supervision including flows and tampers in conjunction with fire alarm system when ready including account set up and monitoring, complete forward flow.
|