Inspections for the day of: Tuesday, May 8, 2012.
Number of inspections: 19
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00788 Aging Inspection5/4/20125/4/2012   
ESC12-00251 General Inspection5/8/20125/8/20125/14/2012 9:14:01 AM PASS
site under construction
ELE11-00164 ELE-Aging Inspection5/8/20125/8/20125/8/2012 5:11:24 PM PASS
permit Doc expired
ELE11-00164 DOC - Permit Expired5/8/20125/8/20125/8/2012 5:09:36 PMPPASS
Job taken over, permited,and completed by licensed electrical contractor
ELE12-01022 Permanent Service5/8/20125/8/20125/8/2012 4:13:17 PMPPASS
p/s o/h rec ok corrections completed, check water pipe bond on final. poly pipe in from street
ELE11-01923 ELE-Aging Inspection5/8/20125/8/20125/8/2012 3:19:08 PM PASS
see final
ELE11-01923 Final5/8/20125/8/20125/8/2012 3:18:36 PMPPASS
final ok
ELE12-00976 Final5/8/20125/8/20125/8/2012 3:16:44 PMPPASS
hot tub final ok
ELE12-00976 Electrical Rough-In5/8/20125/8/20125/8/2012 3:16:01 PMPPASS
hot tub Phone #: ###-#### >> Inspection requested via web by PAT MILLER rough-in ok hot tub branch circuit
ELE12-01038 Electrical Rough-In5/8/20125/8/20125/8/2012 3:14:05 PMPPASS
hello i need wall and ceiling cover call corey with any questions, key above door if locked. thanks for your time. Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover walls and ceiling grid
ELE12-00394 Final5/8/20125/8/20125/8/2012 2:41:31 PMPPASS
Phone #: ###-#### >> Inspection requested via web by daniel bibikov final ok
ELE12-00939 Rough-In Permanent Service5/7/20125/8/20125/8/2012 1:20:19 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Alan Lusk rough-in p/s u/g n ok
ELE12-00978 Final5/8/20125/8/20125/8/2012 12:42:42 PMPPASS
final ok
ELE12-00978 Permanent Service5/7/20125/8/20125/8/2012 12:41:51 PMPPASS
Roger Phone #: ###-#### rough-in ok cover trench, and Hot tub ok
ELE12-01019 Rough-In Permanent Service5/7/20125/8/20125/8/2012 12:06:46 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Dan Rohl rough-in p/s u/g n ok
ELE12-01020 Electrical Rough-In5/8/20125/8/20125/8/2012 10:18:47 AMAFAIL
NEC 300.4 (A)(1) Nail plates NEC 300.4 (2)(D) 1 1/4 clearance from edge of framing member Remove all exsposed nob and tube wiring.
ELE12-00933 Electrical Rough-In5/7/20125/8/20125/8/2012 10:00:19 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Kevin Burke rough-in ok cover basement remodel
ELE12-01020 Final5/7/20125/8/20125/8/2012 9:27:10 AMAFAIL
Please Call Me @ ###-#### Thanks Dave >> Inspection requested via web by jason shifflett NEC.300-4(A)(1) Nail plates NEC 300-4(2)(D) 1 1/4 clearance from edge of framing member. Remove all exsposed nob and tube wiring.
ELE11-02806 Electrical Rough-In5/8/20125/8/20125/8/2012 8:47:30 AMAPASS
Please call mike 30 min prior to inspection at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover (3) hard lid area (3) columns