BLD12-03203
| FIRE-Conference | 5/7/2013 | 5/8/2013 | 5/13/2013 7:27:25 AM | P | DONE |
|
|
On site conference regarding project schedule, fire sprinkler and alarm permit work.
|
FIR13-00148
| INSP-Sprinkler Rough-in | 5/8/2013 | 5/8/2013 | 5/13/2013 7:25:58 AM | P | NR |
|
|
|
FIR13-00179
| INSP-Final Inspection | 5/8/2013 | 5/8/2013 | 5/9/2013 7:52:14 AM | P | PASS |
|
|
Fire alarm work passed inspection. Permit finaled.
|
FIR13-00203
| INSP-Final Inspection | 5/7/2013 | 5/8/2013 | 5/9/2013 7:50:00 AM | P | NR |
|
|
|
BLD12-02771
| FIRE-Final Inspection | 5/7/2013 | 5/8/2013 | 5/9/2013 7:49:31 AM | P | PASS |
|
|
Life safety final okay pending approved style lever hardware is provided at the back exit- to be verified at structural final as agreed. Stairway gate has been secured open.
|
FIR12-00108
| INSP-Sprinkler Rough-in | 5/7/2013 | 5/8/2013 | 5/9/2013 7:47:17 AM | A | PART |
|
|
Reinspection completed for items noted 4/23 third floor.
|
BLD13-00258
| FIRE-Final Inspection | 5/7/2013 | 5/8/2013 | 5/9/2013 7:44:22 AM | A | PASS |
|
|
Fire life safety passed.
|