Inspections for the day of: Wednesday, May 8, 2013.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00070 INSP-Sprinkler Rough-in/Hydro5/8/20135/8/20135/8/2013 3:45:16 PMPFAIL
Wet, dry and UG hydro tests failed due to visible drop in pressure on the guages.
BLD11-02317 FIRE-Conference5/8/20135/8/20135/8/2013 3:18:36 PMPDONE
Met with bruce and discussed work originally shown on the first floor permit and is now shown on the third floor permit.
BLD13-00241 FIRE-Final Inspection5/7/20135/8/20135/8/2013 2:31:04 PMAPASS
life safety passed
BLD13-00274 FIRE-Final Inspection5/7/20135/8/20135/8/2013 2:27:55 PMAPASS
life safety passed
FIR12-00488 FIR-Aging Inspection5/8/20135/8/20135/8/2013 9:32:03 AM NR
Work is in progress
BLD13-01027 FIRE-Final Inspection5/6/20135/8/20135/8/2013 9:24:49 AMAFAIL
Remove the thumbturn locks from both doors, provide sticker on the west door and provide single action hardware on all doors.