BLD15-01448
| BLD-Conference | 5/8/2015 | 5/8/2015 | 5/11/2015 7:15:33 AM | P | DONE |
|
|
Don-please call to meet Phone #: ###-####
|
BLD14-01937
| BLD-Conference | 5/8/2015 | 5/8/2015 | 5/11/2015 7:15:07 AM | P | PASS |
|
|
Stairwell fire rating. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
GCB14-00156
| GCB-Framing | 5/8/2015 | 5/8/2015 | 5/11/2015 7:14:11 AM | P | DONE |
|
|
Mark ###-#### - requested call ahead
|
BLD15-01093
| BLD-Footing | 5/8/2015 | 5/8/2015 | 5/8/2015 3:17:29 PM | P | CANC |
|
|
Cap Phone #: ###-####
|
BLD14-03579
| BLD-Final | 5/8/2015 | 5/8/2015 | 5/8/2015 3:17:15 PM | P | PASS |
|
|
I will be on site all day thanks Miles Phone #: ###-#### Inspection requested via web by Miles Hash
|
BLD15-01079
| BLD-Footing | 5/7/2015 | 5/8/2015 | 5/8/2015 2:19:24 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD13-03405
| BLD-Wall cover | 5/7/2015 | 5/8/2015 | 5/8/2015 10:58:24 AM | A | PART |
|
|
4th ; 5th floor Tower 3 corridor ; unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups corridors ok but rooms not ready
|
BLD15-01448
| BLD-Conference | 5/7/2015 | 5/8/2015 | 5/8/2015 10:56:41 AM | A | NH |
|
|
Don-please call to meet Phone #: ###-####
|
BLD14-01784
| BLD-Final | 5/7/2015 | 5/8/2015 | 5/8/2015 9:27:41 AM | A | NR |
|
|
would like call 30min ahead; Rader Phone #: ###-#### needs tempered glass upstairs bathroom
|
BLD15-01164
| BLD-Framing/Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 9:19:00 AM | A | PASS |
|
|
would like call 30min ahead; Rader Phone #: ###-####
|
BLD14-03660
| BLD-Wall Bracing | 5/8/2015 | 5/8/2015 | 5/8/2015 9:01:00 AM | A | FAIL |
|
|
Shear inspection. gate code is 1201
Call Tim if any issues. Thank you. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin no plans on site
|
BLD15-00571
| BLD-Ceiling Grid Inspection | 5/7/2015 | 5/8/2015 | 5/8/2015 8:40:32 AM | A | PASS |
|
|
Mark Phone #: ###-####
|
BLD15-00789
| BLD-Framing/Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 8:40:16 AM | A | PASS |
|
|
Mark Phone #: ###-####
|