FIR14-00531
| INSP-Sprinkler Rough-in | 5/6/2015 | 5/8/2015 | 5/16/2015 9:40:57 AM | A | PASS |
|
|
Rough-in inspection of Elevator lobiesy, all floors, tower 1.
|
FIR14-00815
| INSP-Sprinkler Rough-in | 5/7/2015 | 5/8/2015 | 5/13/2015 12:00:00 AM | A | PART |
|
|
3rd floor, section 3 & Clubhouse.
|
FIR15-00096
| INSP-Sprinkler Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 12:05:54 PM | A | PASS |
|
|
2nd floor, East drop lids.
|
FIR15-00096
| INSP-Sprinkler Rough-in/Hydro | 5/8/2015 | 5/8/2015 | 5/8/2015 12:02:40 PM | A | PASS |
|
|
2nd floor east wing unit hard lids/drops - unit 210 and 212 needs work
|