MIS16-00342
| MIS-Aging Inspection | 5/8/2017 | 5/8/2017 | 5/9/2017 12:48:11 PM | | CANC |
|
|
|
BLD17-00830
| BLD-Foundation | 5/5/2017 | 5/8/2017 | 5/9/2017 7:41:16 AM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-01021
| BLD-Conference | 5/8/2017 | 5/8/2017 | 5/9/2017 7:41:15 AM | P | PASS |
|
|
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson
|
BLD16-00124
| BLD-Energy code compliance | 5/5/2017 | 5/8/2017 | 5/8/2017 3:26:12 PM | P | PART |
|
|
Ron Phone #: ###-#### West Wing.......OK.
|
BLD16-00124
| BLD-Framing/Rough-in | 5/5/2017 | 5/8/2017 | 5/8/2017 3:25:36 PM | P | PART |
|
|
Ron Phone #: ###-#### West Wing Framing Shear Walls and Energy Code.......OK.
|
BLD16-00156
| BLD-Final | 5/8/2017 | 5/8/2017 | 5/8/2017 1:43:04 PM | P | NR |
|
|
Don Phone #: ###-#### Need Electr final.
|
BLD13-02973
| BLD-Conference | 5/4/2017 | 5/8/2017 | 5/8/2017 1:37:29 PM | A | DONE |
|
|
Met with Tim ....Staff member in charge of Constr. Phase 1.....Sanctuary and Mezzanine remodel appear complete......Phase 2 area is being framed by new contractor. WIP Advised Tim to have Crane alarm and Phoenix Fire to call in for inspection for areas that are completed to obtain a "partial" Pass inspection for those areas.
|
BLD17-00614
| BLD-Final | 5/5/2017 | 5/8/2017 | 5/8/2017 10:28:51 AM | A | PASS |
|
|
Jason Phone #: ###-####
|
BLD17-00614
| DOC - Permit Finaled | 5/8/2017 | 5/8/2017 | 5/8/2017 10:28:25 AM | P | PASS |
|
|
|
BLD16-01021
| BLD-Final | 5/5/2017 | 5/8/2017 | 5/8/2017 10:24:57 AM | A | NR |
|
|
Phone #: 2086157433 >> Inspection requested via mobile web by Dwayne Robinson Need Electr....
|
BLD15-01838
| BLD-Final | 5/5/2017 | 5/8/2017 | 5/8/2017 10:11:55 AM | A | FAIL |
|
|
AJ-call for access Phone #: ###-#### C/N.....Stairs do not meet code for run. Need min. 1 handrail.
|