Inspections for the day of: Tuesday, May 8, 2018.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03899 FIRE-Final Inspection5/8/20185/8/20185/8/2018 1:58:39 PMPPASS
Life safety passed. The existing fire sprinklers and fire alarm devices appear adequate.

Cameron Phone #: ###-####
BLD18-01070 FIRE-Final Inspection5/8/20185/8/20185/8/2018 12:35:51 PMPPASS
Life safety passed

Racheal Phone #: ###-####
FIR18-00307 INSP-Final Inspection5/7/20185/8/20185/8/2018 10:46:03 AMAFAIL
The plans indicate that the area around the new room is Office. It is actually being used for Ordinary Hazard. So plans need to be resubmitted changing the sprinkler spacing from light to ordinary hazard. Also two of the four pendant heads in the new room are utilizing "flex heads" these need to be addressed as well.

Roy Phone #: ###-####
MIS18-00170 FIR-Conference5/8/20185/8/20185/8/2018 10:44:10 AMADONE
I spoke to the head maintenance gentleman and let him know that a building permit would be required for the installation of the new/clean room. Also electrical and mechanical permits and fire alarm permits would need to be provided
BLD18-00337 FIRE-Final Inspection5/7/20185/8/20185/8/2018 10:33:55 AMAFAIL
Provide the exit signs as per the city approved plans. Missing four.

Dale EKC call 30 mins before for access Phone #: ###-####
FIR18-00254 INSP-Final Inspection5/7/20185/8/20185/8/2018 10:33:17 AMAPASS
Permit finaled

Call prior to going >> Inspection requested via mobile web by Doug Lessa
FIR18-00310 INSP-Sprinkler Rough-in5/7/20185/8/20185/8/2018 10:27:24 AMAPASS
Rough-in passed.
BLD18-00711 FIRE-Final Inspection5/7/20185/8/20185/8/2018 8:02:46 AMAPASS
Life safety passed

Ryan Phone #: ###-####