BLD95-01104
| INSP - Carpentry | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | | PASS |
|
|
/ / 340 - BLDG 1...CORE ALMOST COMPLETE, PARTITIONING OFFICE AREA 2ND
|
BLD95-02101
| INSP - Carpentry | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | | PASS |
|
|
/ / 340 - CHK GYP AT INFILL, EXT WALLS AT WINDOW REPLACEMENT...OK; MAS AREAS, WIP ,
|
BLD96-00039
| INSP - Energy code compliance | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | | PART |
|
|
/ / 340 - INS OK, STILLHAS FRAME ISSUES
|
BLD96-00389
| INSP - Framing/Rough-in | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | | FAIL |
|
|
/ / 340 - KEEP C/N OK TO INS
|
BLD96-00769
| INSP - Framing/Rough-in | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | | |
|
|
|
BLD96-01032
| INSP - Footings | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | NR |
|
|
05/09/96 340 - 338 areqa sent to Perry
|
BLD96-01032
| INSP - Foundation | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | CANC |
|
|
05/09/96 340 - 338 AREA, GAVE TO PERRY
|
BLD96-01072
| INSP - Footings | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | PASS |
|
|
05/09/96 340 - HAD CONC. CONT RESTRING LINE TO SHOW SET BACK, LOOKS OK
|
BLD96-01130
| INSP - Roof | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | NR |
|
|
05/08/96 340 - REROOF, ROOF LOADED...NO WIP=
|
BLD96-00409
| INSP - Framing/Rough-in | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | PASS |
|
|
05/08/96 340 - 1 ROOM ...FINISHING BSMT,OTHER INSPS DONE WHEN NEW(1991), CALL FOR FINAL
|
BLD95-00427
| INSP - Framing/Rough-in | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | PART |
|
|
05/08/96 340 - SHEETROCK ... CHK LID, EXT WALLS TO BE 7/8'' STUCCO SYSTE MEMBRANE PROTECTION WHEN GYP COMPLETE. FRAME OK
|
BLD95-01568
| INSP - Framing/Rough-in | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | A | PART |
|
|
05/08/96 340 - HP #7...CORR.& TRANSVERSE WALLS...ELEC OK PER TOM G. 4-17
|
BLD95-02138
| INSP - Final | 5/8/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | P | FAIL |
|
|
05/09/96 340 - C/N, NEED ELEC
|
BLD96-00396
| INSP - Framing/Rough-in | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | P | FAIL |
|
|
05/09/96 340 - REINSPECTION REJECTED ENG'G FROM TJI RE FLOOR JOISTS CUT, SPACING AND FLANGE CUT NOT ADDRESSED BY ENG'R
|
BLD96-00039
| INSP - Framing/Rough-in | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | P | FAIL |
|
|
05/09/96 340 - REINSPECTION STILL INSTALLING ENG'D PANELS AT GAR FRONT
|
BLD96-00724
| INSP - Footings | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | P | PASS |
|
|
05/09/96 340 - CLOSE AT FRONT, CHK WALL...20' REQ'D FROM COMMON DRIVE PE
|
BLD96-00726
| INSP - Footings | 5/9/1996 | 5/9/1996 | 5/9/1996 12:00:00 AM | P | PASS |
|
|
05/09/96 340 - POURED W/O INSP, APPEARS OK
|