BLD01-00852
| BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
|
BLD01-00852
| BLD-Energy code compliance | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00927
| BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
|
BLD01-00927
| BLD-Energy code compliance | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01531
| BLD-Conference | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
for conf-- val--###-#### -call 1st before insp Review of plans and work completed. 5/9/2001 11:56:31 AM
|
BLD01-00571
| BLD-Energy code compliance | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
chad ###-####
|
BLD01-00571
| BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
Reinspection chad
|
BLD01-00032
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
two exterior colums\\###-#### OK to cover (rear) Corridor and Long North to South wall ....1 side only. 5/9/2001 5:39:38 PM
|
BLD01-00936
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
chuck ###-#### C/N issued. 5/9/2001 12:45:31 PM
|
BLD01-00854
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
shear wall Chuck ###-#### Shear OK. 5/9/2001 12:45:56 PM
|
BLD01-00987
| BLD-Footing | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
manuel ###-#### ft
|