Inspections for the day of: Wednesday, May 9, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00852 BLD-Framing/Rough-in5/8/20015/9/20015/9/2001 12:00:00 AMAPASS
BLD01-00852 BLD-Energy code compliance5/8/20015/9/20015/9/2001 12:00:00 AMAPASS
###-####
BLD01-00927 BLD-Framing/Rough-in5/8/20015/9/20015/9/2001 12:00:00 AMAPASS
BLD01-00927 BLD-Energy code compliance5/8/20015/9/20015/9/2001 12:00:00 AMAPASS
###-####
BLD00-01531 BLD-Conference5/8/20015/9/20015/9/2001 12:00:00 AMAPART
for conf-- val--###-#### -call 1st before insp Review of plans and work completed. 5/9/2001 11:56:31 AM
BLD01-00571 BLD-Energy code compliance5/8/20015/9/20015/9/2001 12:00:00 AMPPASS
chad ###-####
BLD01-00571 BLD-Framing/Rough-in5/8/20015/9/20015/9/2001 12:00:00 AMPPASS
Reinspection chad
BLD01-00032 BLD-Framing/Rough-in5/9/20015/9/20015/9/2001 12:00:00 AMPPART
two exterior colums\\###-#### OK to cover (rear) Corridor and Long North to South wall ....1 side only. 5/9/2001 5:39:38 PM
BLD01-00936 BLD-Framing/Rough-in5/9/20015/9/20015/9/2001 12:00:00 AMPFAIL
chuck ###-#### C/N issued. 5/9/2001 12:45:31 PM
BLD01-00854 BLD-Framing/Rough-in5/9/20015/9/20015/9/2001 12:00:00 AMPPART
shear wall Chuck ###-#### Shear OK. 5/9/2001 12:45:56 PM
BLD01-00987 BLD-Footing5/9/20015/9/20015/9/2001 12:00:00 AMPPART
manuel ###-#### ft