MEC01-01279
| Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 12:11:25. Contact: ###-####.
|
MEC01-00102
| Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 13:25:21. Contact: ###-####. for the grease duct only duct in shaft ok 5/9/2001 10:16:19 AM
|
MEC01-00593
| Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 16:13:34. Contact: ###-####. c/n posted 5/9/2001 10:43:12 AM
|
MEC00-02713
| Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 08:54:48. Contact: ###-####.
|
MEC01-01250
| Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 11:11:59. Contact: ###-####. water heater not done 5/9/2001 2:45:39 PM
|
MEC01-01362
| Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
###-#### furnace gas line and 1 bath vent c/n posted 5/9/2001 5:11:28 PM
|
MEC01-01362
| Pressure Test | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-01300
| Pressure Test | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
Joann ###-#### no address 5/9/2001 5:11:06 PM posted 5/9/2001 5:11:10 PM
|
MEC01-01363
| Final | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 09:27:14. Contact: ###-####. sign occ card 5/9/2001 1:28:17 PM
|