BLD00-03449
| BLD-Conference | 5/9/2001 | 5/9/2001 | 5/14/2001 12:00:00 AM | P | PASS |
|
|
w/ john schultz 5/14/2001 3:10:57 PM
|
BLD01-00525
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/9/2001 10:58:25 AM ok to usr frt wood at door/window openings w/i assy
|
BLD01-00393
| BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
###-####...may need hvac final,will consult, struct ok for t/o. 5/9/2001 3:36:30 PM
|
BLD00-01649
| BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/9/2001 10:42:36 AM walk through...need shafts at hvac exhaust ducts fl 3,4
|
BLD00-02394
| BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
w/ John...need all project info, plans etc. Eng'r to report at final & for changes. 5/14/2001 11:42:02 AM
|
BLD00-00794
| BLD-Footing | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
ft insp mark= ###-#### ok per plan 5/9/2001 4:47:53 PM
|
BLD00-03697
| BLD-Final | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
###-####need htg, plans onsite 5/9/2001 2:41:05 PM
|
BLD01-00296
| BLD-Final | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
need plans 5/9/2001 2:41:14 PM
|
BLD00-03195
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
###-####
still has energy c/n...inaccurate mec check submitted 5/9/2001 5:03:25 PM d 5/9/2001 5:03:31 PM 5/9/2001 5:03:44 PM
|
BLD01-00452
| BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/9/2001 3:49:55 PM w/ Carl Westfall, submittal re entry/exit doors; ok as shown to sing entry doors in if signed and pemanently open during business.
|
BLD01-01079
| BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/9/2001 4:03:53 PM w/ Dane marcum re inspection...need correct plot
|