FIR01-00102
| INSP-Sprinkler Rough-in/Hydro | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
###-#### building 4 OK to cover entire bldg 5/9/2001 11:54:20 AM
|
FIR01-00192
| INSP-Supply line flush | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 10:00:23. Contact: ###-####. OK to cover under slab main and riser stub in to bldg 5/9/2001 11:01:22 AM
|
BLD00-01103
| FIRE-Final Inspection | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | CANC |
|
|
###-#### please call before you go Cancel Permit already finaled 5/9/2001 11:02:11 AM
|
BLD00-02944
| FIRE-Final Inspection | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | FAIL |
|
|
###-#### gate code 7208 Final Fail Approved plans not on site 5/9/2001 12:23:52 PM
|