BLD99-03720
| BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
fn occ-- ###-#### terry
|
BLD00-03409
| BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | FAIL |
|
|
shear wall Phil ###-####
no plans, not nailed off properly 5/9/2001 10:04:52 AM
|
MEC01-00186
| Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | CANC |
|
|
Shauna ###-####
Dixie took this 4 me 5/9/2001 9:53:32 AM
|
MEC01-00628
| Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
###-####
could not put final sticker on furnace due to wet paint so I put it loose on the range 5/9/2001 11:43:19 AM
|
BLD01-01192
| BLD-Framing/Rough-in | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PASS |
|
|
###-####,,,,not framing just a ftg, ok w/ verbal corrections 5/9/2001 9:04:26 AM
|
BLD01-00226
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 07:13:24. Contact: ###-####.,,,need eng. set of truss specs,,verify truss d-2,,,ok to insulate 5/9/2001 11:31:17 AM
|
BLD00-01478
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 07:21:44. Contact: ###-####.
|
BLD01-01192
| BLD-Foundation | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
5/9/2001 2:49:26 PM
|
BLD00-01478
| BLD-Framing/Rough-in | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
c/n posted on insulation sticker, firewall vertical and horizontal, strap top plates, etc. 5/9/2001 2:46:27 PM
|
BLD01-00171
| BLD-Footing | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 10:27:46. Contact: ###-####.
already poured, pending S. i. report 5/9/2001 3:49:10 PM
|
BLD99-03720
| BLD-Final | 5/9/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | PASS |
|
|
###-####
ok for permanent occupancy 5/9/2001 1:51:51 PM
|
BLD00-02561
| BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 16:05:06. Contact: ###-####.need all trades signed off, no inspection made 5/9/2001 4:08:28 PM
|
MEC01-01106
| Pressure Test | 5/7/2001 | 5/9/2001 | 5/8/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/07/2001 at 12:00:25. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/08/2001 at 22:35:21.
|