ELE02-01384
| Rough-In Permanent Service | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PART |
|
|
KEVIN ###-#### ( PIPE )
U/G to garage ok 5/9/2002 10:29:23 AM
|
ELE02-01386
| Rough-In Permanent Service | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PART |
|
|
KEVIN ###-#### ( PIPE )
U/G to garage ok 5/9/2002 10:29:49 AM
|
ELE01-02180
| Electrical Rough-In | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | NR |
|
|
###-####
protection of mc cable 5/9/2002 1:48:28 PM
|
ELE02-01328
| Permanent Service | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
###-####
P/S O/H R Ok 5/9/2002 10:52:08 AM
|
ELE02-01343
| Permanent Service | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
SKIP ###-####
P/S O/H R Ok 5/9/2002 10:30:14 AM
|
ELE02-00353
| Final | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | NR |
|
|
temp occ ###-####
checking listing on x ray equipment 5/9/2002 5:00:42 PM
|
ELE02-01362
| Electrical Rough-In | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
jeff ###-####
|
ELE02-01165
| Rough-In Permanent Service | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 10:14:06. Contact: ###-####.
electroed ok for concrete 5/9/2002 3:01:49 PM
|
ELE02-01401
| Permanent Service | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
###-####
P/S O/H R Ok 5/9/2002 5:28:50 PM
|
ELE02-01233
| Electrical Rough-In | 4/26/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | NR |
|
|
Conference ###-#### Robert Flowers
Had conf about ejection pump circuit 5/9/2002 3:03:31 PM
|