BLD02-00437
| BLD-Final | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | NR |
|
|
5th floorout of time on 5/9 301...nr, install doors, hdwe...patch/seal lid or walls as needed, install extinguishers. ok to place fixtures/furnishings. Restrooms considered as phase 2. 5/10/2002 11:33:37 AM
|