BLD02-00912
| BLD-Foundation | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 06:44:33. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/09/2002 at 07:14:30.
|
BLD02-00249
| BLD-Final | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 10:49:11. Contact: ###-####. c/n on site-needs mech. and plumbing finals. 5/9/2002 9:48:19 AM
|
BLD02-00287
| BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
###-#### Ok to cover 5/9/2002 11:24:35 AM
|
BLD02-00916
| BLD-Foundation | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 13:22:46. Contact: ###-####. wip 5/9/2002 9:06:59 AM
|
MEC02-00696
| Final | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 13:57:11. Contact: ###-####.
|
BLD01-02536
| BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
CEILING GRID-DALE ###-#### Ok to cover remaining areas. 5/9/2002 11:52:59 AM
|
BLD02-00959
| BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 06:00:14. Contact: 94145388. wip 5/9/2002 9:06:46 AM
|
BLD02-00912
| BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:15:38. Contact: ###-####.
|
BLD01-02970
| BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:18:33. Contact: ###-####. Fir out walls on main and 2nd floor--ok to cover--north side only. 5/9/2002 10:22:10 AM
|
BLD02-00358
| BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:47:48. Contact: . C/N ok to insulate 5/9/2002 1:53:04 PM
|
BLD02-00442
| BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
###-#### bruce Prior c/n items completed--ok to insulate. 5/9/2002 4:14:14 PM
|
BLD02-00856
| BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PART |
|
|
###-#### rob stem wall FOUNDATION NOT FRAMING--wip 80% ready at time of inspection. 5/9/2002 4:12:49 PM
|
BLD02-00609
| BLD-Framing/Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PART |
|
|
shear brian ###-#### SHEAR-ok except one panel inside garage--check at framing. Ok to cover exterior. 5/9/2002 4:13:42 PM
|
MEC02-00888
| Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 5/9/2002 12:24:23 PM
|
BLD02-00858
| BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:17:15. Contact: ###-####. Cancelled by contractor. 5/9/2002 2:42:24 PM
|
BLD02-00854
| BLD-Footing | 5/9/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 07:12:46. Contact: ###-####. wip--85% ready at time of inspection. 5/9/2002 4:12:31 PM
|
BLD01-02890
| BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
fr insp -###-####- lori Correction items done and engineering received per request. 5/9/2002 2:23:17 PM
|
BLD01-02890
| BLD-Energy code compliance | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
lori- ###-#### Ok to cover 5/9/2002 2:23:29 PM
|
BLD01-03038
| BLD-Framing/Rough-in | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | FAIL |
|
|
fr insp lori ###-#### C/N posted--Do not insulate 5/9/2002 1:52:45 PM
|
BLD02-00168
| BLD-Final | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 16:35:36. Contact: ###-####. C. of C. 22397 issued. 5/9/2002 1:09:10 PM
|
BLD02-00298
| BLD-Energy code compliance | 5/8/2002 | 5/9/2002 | 5/9/2002 12:00:00 AM | P | PASS |
|
|
###-#### Ok to cover 5/9/2002 12:26:14 PM
|