BLD00-03667
| BLD-Aging Inspection | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | | CANC |
|
|
|
BLD03-00301
| BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 10:50:55 AM. Contact: ###-####.Would be ok for an occupancy if fire life safety would approve. Not approved at this time due to this. 5/9/2003 10:31:08 AM
|
BLD03-00335
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PASS |
|
|
martain ###-#### shear nailroof 5/9/2003 11:17:24 AM
|
BLD03-00673
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PASS |
|
|
gil celing grid ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD02-01112
| BLD-Final | 5/7/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | FAIL |
|
|
###-####. This needs the electrical finaled, also went over other items that need to be addressed prior to calling for a final.2003 12:01:28 PM 5/9/2003 12:12:26 PM
|
BLD02-02471
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PART |
|
|
###-#### Still has some areas to address went over this with contractor. 5/9/2003 3:38:27 PM 5/9/2003 3:39:14 PM
|
BLD03-00446
| BLD-Other | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 5/9/2003 at 6:25:24 AM. Contact: ###-####.Ceiling all ok except the area of the beam at the notrh side. 5/9/2003 2:21:02 PM
|
BLD03-00769
| BLD-Footing | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PASS |
|
|
chuck; Phone #: ###-#### Internet Inspection Request from: Darla Downs as per plans 5/9/2003 4:14:16 PM
|
BLD03-00505
| BLD-Footing | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PART |
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Darla Downs. i still have not yet seen the approved permit set of plans I called builder and he will get them and have them on the job. 5/9/2003 3:47:44 PM
|
BLD03-00504
| BLD-Framing/Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PASS |
|
|
kole shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-00624
| BLD-Framing/Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | FAIL |
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNo plans on site, note need to meet with builder, about this some items i have questions about left this message with owner and wrote provide plans on job card. do not cover. 5/9/2003 2:07:15 PM
|
BLD03-00104
| BLD-Energy code compliance | 5/8/2003 | 5/9/2003 | 5/8/2003 8:57:51 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 8:41:21 AM. Disp set to [CANC] by a contractor via Hello! on May 8 2003 8:57AM.
|