BLD03-00819
| BLD-Foundation | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/8/2003 at 11:53:03 AM. Contact: ###-####.
wip, need to dowell into existing 5/9/2003 10:29:29 AM
|
BLD03-00447
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PASS |
|
|
tracy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
shear ok also 5/9/2003 9:50:12 AM
|
BLD03-00537
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD03-00411
| BLD-Framing/Rough-in | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | PASS |
|
|
kurt; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD02-02306
| BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | A | NH |
|
|
ASA; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00324
| BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | FAIL |
|
|
lock box 5830 ###-####
need trades and smoke detectors per plan 5/9/2003 3:36:57 PM
|
BLD02-02551
| BLD-Final | 5/8/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | FAIL |
|
|
###-####
walk through only,,, need trades, hillside,,, attic insulation, underfloor insulation on stem walls put up in some areas, 6" reveal on outside,,, etc 5/9/2003 4:35:02 PM
|
BLD03-00311
| BLD-Footing | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PART |
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
wip 5/9/2003 2:15:56 PM
|
BLD02-02306
| BLD-Final | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PASS |
|
|
ASA-###-####
|
BLD03-00411
| BLD-Framing/Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 12:00:00 AM | P | PASS |
|
|
|