FIR05-00248
| INSP-Sprinkler Rough-in | 5/9/2005 | 5/9/2005 | 5/9/2005 4:09:27 PM | P | CANC |
|
|
Inspection cancelled per. contractor due to poor weather conditions. Work not ready, will re-schedule.
|
FIR05-00177
| INSP-Final Inspection | 5/9/2005 | 5/9/2005 | 5/9/2005 1:22:48 PM | P | PART |
|
|
PIV #1 is OK to cover. Need to verify new tamper switch operation, valve cycled open and closed, and height of PIV above grade after bury.
|
BLD05-00572
| FIRE-Final Inspection | 5/6/2005 | 5/9/2005 | 5/9/2005 10:39:45 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD05-00259
| FIRE-Final Inspection | 5/6/2005 | 5/9/2005 | 5/9/2005 10:38:15 AM | A | FAIL |
|
|
Need building suite address posted. Need approved door hardware installed, waiting on parts delivery per. contractor.
|
FIR05-00083
| INSP-Final Inspection | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
FIR05-00117
| INSP-Final Inspection | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled.
|
FIR05-00179
| INSP-Final Inspection | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | PASS |
|
|
Fire alarm finaled.
|
FIR05-00179
| INSP-Alarm Testing | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | PASS |
|
|
Fire alarm finaled.
|