BLD05-00122
| BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/6/2005 at 12:57:48 PM. Contact: ###-####.
c/n,, ok to insulate 5/9/2005 11:23:57 AM
|
BLD05-00784
| BLD-Footing | 5/6/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | A | CANC |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
canc due to rain 5/9/2005 10:51:54 AM
|
BLD05-00594
| BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | A | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD04-00907
| BLD-Framing/Rough-in | 5/7/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 5/7/2005 at 8:37:52 AM. Contact: ###-####.
exterior shear ok now 5/9/2005 12:04:31 PM
|
BLD02-02566
| BLD-Conference | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | FAIL |
|
|
erik ###-#### pending fire fn
met w/ Eric,, gave c/n to get finals completed to obtain/retain c of o,, recomended for him get records at PDS if needed 5/9/2005 3:25:37 PM
|
BLD04-02215
| BLD-Final | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | NR |
|
|
robin; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
need fireplace final,,, asked to get manual on site prior to calling inspection in,,, gave paperwork for bank purposes,, will recall when done w/ front steps/ handrail 5/9/2005 3:21:06 PM
|
BLD05-01182
| BLD-Footing | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | CANC |
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore///cancelled per josh 5/9/05 11:57am LEM
|
BLD05-00995
| BLD-Footing | 5/9/2005 | 5/9/2005 | 5/9/2005 12:00:00 AM | P | CANC |
|
|
###-#### doug - doug cancelled 10:30 am
|