Inspections for the day of: Monday, May 9, 2005.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00136 Tracking Control5/9/20055/9/20055/9/2005 11:15:39 AMPPART
site looks okay, but D/I needs some maintaining, contacted RP.
ESC04-01194 Tracking Control5/9/20055/9/20055/9/2005 11:02:34 AMPPASS
site looks okay, called developer to talk about maintaining bmp's on vacant lots.
ESC05-00084 Tracking Control5/9/20055/9/20055/9/2005 11:02:20 AMPPASS
site looks okay, called developer to talk about maintaining bmp's on vacant lots.
ESC04-01052 Tracking Control5/9/20055/9/20055/9/2005 11:02:03 AMPPASS
site looks okay, called developer to talk about maintaining bmp's on vacant lots.
ESC04-00371 Tracking Control5/9/20055/9/20055/9/2005 11:01:51 AMPPASS
site looks okay, called developer to talk about maintaining bmp's on vacant lots.
ESC04-01099 Tracking Control5/9/20055/9/20055/9/2005 10:09:28 AMPPART
spoke with RP about reminding his subs to park on the hard surface when possible. especially during the rainy times. spoke with subs as well. will follow up.
ESC03-01557 Tracking Control5/9/20055/9/20055/9/2005 9:55:46 AMPPART
Contacted RP about maintaing construction entrance and the bmp's along Bogus Basin. concerned about flooding in parking lot. Will follow up this afternoon.