FIR08-00256
| INSP-Sprinkler Rough-in | 5/8/2008 | 5/9/2008 | 5/9/2008 4:13:40 PM | A | PASS |
|
|
The underground supply line was installed as per plan and can be covered. It took three trips to perfom this inspection due to the piping being covered with sand and no access into the trench to verify the pipe size installed.
|
FIR07-00874
| INSP-Sprinkler Rough-in/Hydro | 5/7/2008 | 5/9/2008 | 5/9/2008 3:49:07 PM | A | PART |
|
|
The hydro test of the south wing dry system passed. The hydro test of the south wing wet system failed.
|
BLD07-02423
| FIRE-Final Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 2:24:54 PM | A | FAIL |
|
|
Provide tags for the three fire extinguishers. Provide remote annunciators as discussed for the duct smoke detectors. The duct smoke detectors are mounted in the 90 degree elbows of the return air ducting. A manometer test will be required or the ducting modified to the 6 to 10 duct widths as per NFPA 72. All other items checked out ok.
|
FIR08-00212
| INSP-Sprinkler Rough-in/Hydro | 5/8/2008 | 5/9/2008 | 5/9/2008 12:39:03 PM | A | FAIL |
|
|
The approved plans that were on site the last inspection have disapeared. I let the fire sprinkler contractor know where to get copies. I went over the previous deficiencies with him. No new inspection was performed.
|
FIR07-00697
| INSP-Sprinkler Rough-in/Hydro | 5/8/2008 | 5/9/2008 | 5/9/2008 12:09:31 PM | A | FAIL |
|
|
The above ground hydro test failed.
|
FIR08-00120
| INSP-Final Inspection | 5/8/2008 | 5/9/2008 | 5/9/2008 10:27:24 AM | A | PASS |
|
|
Permit finaled
|